The following sections can be expanded to give the detail by clicking on the right pointing carat (on the left next to the title). It can be closed by selecting the same (now up-pointing) carat.
| BI Name | BI Expectation | Specify | Implement | Monitor | Ghanaian Mining Legislation |
|---|---|---|---|---|---|
| BI-CDA.03 There is an appropriate and up-to-date training management system |
A process should be in place for delivering and maintaining competency-based training to provide skilled personnel for all roles on site. |
The training management system:
Procedure, Competence, Training and Assessment HSMP 4.2 PR V12 4/6/24 – S6.1 Identify training needs taking a risk-based approach and prepare a TNA for each role in a Department. 6.1.9 Competent people to be engaged to prepare and administer TNAs. S6.2 All people to be Trained and Competent. S6.3 to 6.6 People to be appointed after inducted and if needed have First aid and other non-technical skills. S6.7 and 6.8 Manage training and keep records. OFI-101 Resolve document reference duplicates for different GHG operations Consultant Comment: During ‘work as documented’ mapping for Tarkwa, documents for Damang were also provided. Some of these had duplicate or similar titles. If these duplicate or similar documents are accessible by decision makers at both sites then choosing the incorrect document could result in site inappropriate design or planning decisions. Review how the document information protocol applies to documents across all GHG operations. Identify situations where common standards apply and where site specific approaches apply and update document management processes. |
|
|
GMMHST2012-510 Hours of work capped at 8 hrs per day and 40 (UG) or 45 (Surface) hours per week GMMHST2012-516 Provide and maintain change, bath and crib rooms GMMHST2012-555 Workers to be fit for work and not consume or bring drugs or alcohol to site |
| BI-CDA.09.01 Fit for work processes with specific advice on self-management |
Operating sites should develop and maintain processes that support personnel to be both fit for work and to maintain a healthy work-life balance. |
Personnel are trained in how to manage shift work and other workplace demands. The training covers site requirements for:
|
Training and assessment carried out to schedule. Health and wellness self-management information is provided. Routine reinforcement of site impairment management expectations and processes. Fatigue Management Procedure TGM.1.20.09 WI V9 01/07/2022 – Reinforces requirements for using and reacting to Guardvant fatigue events. Radio call of SAFETY-SAFETY-SAFETY and call truck number for stop until the supervisor can attend. OFI-170 Review provision of resting rooms for fatigue management. Managing fatigue in mining operations is a challenge for all continuous mining operations. Effective management of fatigues requires a whole of system approach that can include providing comfortable locations for taking fatigue breaks. Workshop participants discussed Business Partner processes for taking fatigue breaks noting that there are limited options for short rests. Review the benefits of providing dedicated resting rooms for fatigued mobile equipment operators. |
Confirmation that fit for work training and awareness is completed to schedule and that work area references are available. Fatigue monitoring technology, incident reviews. |
DP05-05.03 PUE Injury or illness from physical and/or mental fatigue GMMHST2012-510 Hours of work capped at 8 hrs per day and 40 (UG) or 45 (Surface) hours per week GMMHST2012-516 Provide and maintain change, bath and crib rooms GMMHST2012-555 Workers to be fit for work and not consume or bring drugs or alcohol to site |
| BI-CPA.03.01 Trained, Competent and Authorised Mobile Equipment Operators |
All workers who operate mobile equipment at the mine are trained and assessed for competency for operating defined equipment type, identifying and managing operating environment and vehicle interaction hazards. |
All workers who operate mobile equipment at the mine (and other workers who routinely interact with vehicles e.g. maintainers) are trained and assessed for competency covering site and role relevant aspects including:
Comptence Training and Awareness Procedure, V12, 4/6/24, HSMP 4.2 PR – S6.1 Determine training needs …identification of required skills, generation of a training log, minimum skills relate to understanding HSMS work standards |
Mobile equipment operator training is delivered to schedule. Where applicable training is supported by use of equipment simulators – to safely confirm competency in emergency and unwanted situations such as mechanical or electrical faults, fire, emergency stop, over-speed, sticky loads, etc.) OFI-146 Review Operator Training for Installed Technology Workshop participants discussed mobile equipment operator training and questioned what is formally documented and how it is communicated. They were unsure of how information about using installed technology for CAS and OAS is being communicated for new operators and during operator refresher training and authorisation. Confirm that operator training in the use of technology includes pre-start checks, defect reporting, expected response to alarms, and are part of simulator refresher training. OFI-145 Review Operator Training for Equipment Features by Vehicle Type. The workshop participants identified situations where mobile equipment operators do not understand all the features of the equipment that they are using. Lack of knowledge of equipment features and requirements can lead to unwanted operating practices and cause damage to equipment. Review training modules to confirm that key operational aspects of equipment are well covered and easily understood by operators in training. Provide visual information about equipment features by type as a reference in work areas. |
Training status reports. Skills matrix reviews and updates. Routine audits of the training management system are commissioned and reviewed by senior personnel. Off Highway Dump Truck-Operator Practical Assessment – Confirms understanding of key skills and machine requirements by observing pre-use checks and machine operation. |
GMMHST2012-290 Engineering Manager to select appropriate equipment and confirm skills of operators and maintainers GMMHST2012-294 Only authorised people to enter site, operate, or maintain machinery GMMHST2012-463 (1-7) Develop and implement specifications for selection and SOPs for operation and maintenance of Hydraulic Excavators with training and authorisation of operators and maintainers GMMHST2012-463 (8-11) Develop and implement SOPs for loading and moving operations including training and authorisation of operators, truck drivers and spotters GMMHST2012-464 Develop SOPs for Dragline use GMMHST2012-465 (4g-7) Operators to be trained and authorised, loads are placed and moved safely. Vehicles to meet site specifications for safety, energy isolation, lights, indicators and flashing lights. Passengers to be in designed seats with restraints GMMHST2012-511 Manager to train workers in how to comply with regulations |
| BI-CPA.04.01 General features by vehicle type – information prepared for operators |
General features and information organised by vehicle type, are documented and communicated to vehicle operators. |
Training modules for vehicle operators includes relevant information and key safety features for the vehicles in use on the site. The information is provided in a format that is audience appropriate and available as a reference in the work area. |
Training and assessment of vehicle operators about the general features of the vehicle they are operating. Dump Truck Inspection Walk Around – Series of slides showing the truck and key locations and components. OFI-145 Review Operator Training for Equipment Features by Vehicle Type. The workshop participants identified situations where mobile equipment operators do not understand all the features of the equipment that they are using. Lack of knowledge of equipment features and requirements can lead to unwanted operating practices and cause damage to equipment. Review training modules to confirm that key operational aspects of equipment are well covered and easily understood by operators in training. Provide visual information about equipment features by type as a reference in work areas. |
Confirmation that work area references are available. Initial and refresher training assessment outcomes. Records of topics covered at inductions, training, pre-shift meetings, etc. |
GMMHST2012-091 Unconsolidated material to be dug within range of equipment GMMHST2012-098 No passengers without seat belts GMMHST2012-099 Seat belts not required for excavators whilst digging GMMHST2012-105 SOPs to be established for truck loading GMMHST2012-288 Engineering Manager to implement a Management System to achieve fit for purpose equipment and appropriate defect management GMMHST2012-291 Engineering Manager to provide for constant monitoring and control of all hazardous equipment GMMHST2012-303 Start up warnings required for moving machinery GMMHST2012-515 Lease holder to develop a safe work practice code to protect against operational hazards in mining, engineering, or processing |
| BI-CPA.04.02 Sight lines and blind spots by vehicle type – information prepared for vehicle operators |
Mobile equipment sight lines and blind spot information, by vehicle type, is documented and communicated to vehicle operators. |
Training modules include specific information on operator vision limits and sight lines for the vehicles in use. The information is provided in a format that is audience appropriate and available as a reference in the work area. |
Training and assessment for people who operate mobile equipment covers sight lines and blind spots. Mobile equipment operators are aware of vehicle sight lines and blind spots by vehicle type and this information is regularly reinforced. OFI-117 Consider providing visual reference materials for mobile equipment operators. Mobile equipment operators are provided training by their employers, the Tarkwa Mine Business Partners. Each two years, based on the renewal cycle for their Ghanaian national drivers license, mobile equipment operators are reassessed and reauthorised to work on site by the Tarkwa Gold Fields training team. This reassessment includes use of simulators and is supported by detailed, visual training and support material covering equipment operations, mobile equipment information including expected responses to alerts and alarms. Workshop participants were largely unaware of the training and support material and discussed options for making it available beyond the two year reauthorisation cycle. Their initial focus was on responses to alerts and alarms but they also recognised the usefulness of having information by vehicle type available covering sight lines and blind spots, prestart checks, emergency response e.g. fire suppression and emergency egress, and other general operating details. Consider working with business partners and adapting training materials to develop visual reference material that can be in equipment cabins and workplaces e.g. laminated cards, information cycling on videos etc. OFI-122 Update simulator modules to include sight lines Vehicle operators get limited exposure to the real experience of restricted sight lines from heavy mobile equipment during their training. It is understood that there are options to update simulator training to highlight sight lines by equipment type supported by a 360 degree camera view. Lack of understanding about sight lines for operators of mobile equipment and people that work around mobile equipment has resulted in significant incidents, including multiple fatalities. Consider updating the simulator training to include the use of 360 degree cameras to increase the level of understanding of sight lines from operator positions in the cabin. |
Confirmation that work area references are available. Records of topics covered at inductions, training, pre-shift meetings, near miss reviews etc. Interaction monitoring with by-exception reporting from vehicle cameras and collision avoidance technology. |
|
| BI-CPA.04.03 Vehicle lights and markings requirements – information prepared for operators |
Site standards for vehicle lights and markings to improve vision from and visibility of mobile equipment are documented and communicated in a style that is appropriate for the audience. |
Training modules include specific information on site standards for vehicle lights and markings. The information is provided in a format that is audience appropriate and available as a reference in the work area. Supervisors, vehicle operators, and maintainers routinely check that lights and markings meet site standards, are operating, and are visible. GHG Tarkwa Traffic Management Plan, Mining Operations Procedure, TGM 1.10.54 WI as approved for use 01-03-07 details site requirements for light types and use in section 6.2.1.1. Lights |
Training and assessment for supervisors, mobile equipment operators, and maintainers covers minimum site standards for vehicle lights and markings. Training and assessment includes identifying vehicle types by lighting and markings, prestart check processes, defect reporting, and repair prioritisation. |
Vehicle operator, maintainers and co-workers are assessed on their understanding of minimum site standards for vehicle lights and markings. Confirmation that work area references are available. Mobile equipment prestart checks confirm that vehicle lights and markings meet minimum standards before the equipment is operated. Maintenance and service records confirm that:
|
GMMHST2012-104 Vehicle markings and lights to be visible, cabins to be ROPS and FOPS, horns to be audible, and flashing lights and flags to be in place and maintained |
| BI-CPA.04.04 Required emergency checks before operation – information for operator by vehicle type. |
Required emergency checks before operation are documented and communicated to vehicle operators. |
Vehicle operator emergency check training by vehicle type covers:
The information is provided in a format that is audience appropriate and available as a reference in the work area. |
Training and assessment of vehicle operators confirms that they understand the required emergency related prestart check requirements for the vehicle that they are operating. Prestart inspection forms capture that emergency checks are completed. OFI-146 Review Operator Training for Installed Technology Workshop participants discussed mobile equipment operator training and questioned what is formally documented and how it is communicated. They were unsure of how information about using installed technology for CAS and OAS is being communicated for new operators and during operator refresher training and authorisation. Confirm that operator training in the use of technology includes pre-start checks, defect reporting, expected response to alarms, and are part of simulator refresher training. OFI-117 Consider providing visual reference materials for mobile equipment operators. Mobile equipment operators are provided training by their employers, the Tarkwa Mine Business Partners. Each two years, based on the renewal cycle for their Ghanaian national drivers license, mobile equipment operators are reassessed and reauthorised to work on site by the Tarkwa Gold Fields training team. This reassessment includes use of simulators and is supported by detailed, visual training and support material covering equipment operations, mobile equipment information including expected responses to alerts and alarms. Workshop participants were largely unaware of the training and support material and discussed options for making it available beyond the two year reauthorisation cycle. Their initial focus was on responses to alerts and alarms but they also recognised the usefulness of having information by vehicle type available covering sight lines and blind spots, prestart checks, emergency response e.g. fire suppression and emergency egress, and other general operating details. Consider working with business partners and adapting training materials to develop visual reference material that can be in equipment cabins and workplaces e.g. laminated cards, information cycling on videos etc. |
Training system records confirm that vehicle operators are trained and competent in carrying out required prestart checks. Supervisors and maintainers review the quality of prestart records. Maintenance reports confirm that faults detected at prestart checks are being corrected. |
|
| BI-CPA.04.05 Alarm and vehicle information panel expected response – information prepared for Operators |
Expected responses to vehicle alarms and information displays are documented by vehicle type and communicated to vehicle operators. |
Vehicle operator training modules include required responses to vehicle alarms and information panel indicators for each vehicle type in use. Training is based on good operating practice and includes real world scenarios covering:
The information is provided in a format that is audience appropriate and available as a reference in the vehicle. OFI-132 Review site equipment specifications for key system alarms. Workshop participants discussed detection and warning systems capability on mobile equipment e.g. alerts and alarms for key systems such as brakes, steering and wheel assemblies e.g. tyre pressure. There have been incidents at Tarkwa where failures in
mobile equipment systems have caused vehicle interactions. Consider reviewing site equipment specifications for alerting and alarming capability for key systems e.g. brakes, steering, wheel assembly conditions etc. |
Before operating unsupervised, vehicle operators are assessed as being competent in responding to alarms and information panel indicators, for each type of vehicle that they operate. This includes details of the site process for seeking further maintenance advice. Reference information is available and regularly reinforced. OFI-175 Leverage operator equipment alarm training and awareness resources. Tarkwa mine training has prepared comprehensive materials on expected responses mobile equipment alarms for operators in a highly visual style. This resource is used for operator training and to confirm competency during site authorisation approval. However, some workshop participants were unfamiliar with this alarm training and awareness resource. Review how these operator equipment alarm training and awareness resources can be applied through other communication channels beyond the two year authorisation cycle e.g. using posters, laminated cards in cabs, videos, etc. Consider sharing this benchmark high-quality work across the Gold Fields Group. OFI-113 Review response processes for equipment alert and alarm notification. Workshop participants confirmed that machine state alerts, alarms, and other information is transmitted back to dispatch. Advice, instructions, and directions are then relayed back via dispatch to vehicle operators. This sequence can result in extensive delays and has resulted in equipment damage and ongoing operations with compromised systems. Review the current process for prompting operators about machine state alarms and consider the cost and benefits of other approaches. OFI-117 Consider providing visual reference materials for mobile equipment operators. Mobile equipment operators are provided training by their employers, the Tarkwa Mine Business Partners. Each two years, based on the renewal cycle for their Ghanaian national drivers license, mobile equipment operators are reassessed and reauthorised to work on site by the Tarkwa Gold Fields training team. This reassessment includes use of simulators and is supported by detailed, visual training and support material covering equipment operations, mobile equipment information including expected responses to alerts and alarms. Workshop participants were largely unaware of the training and support material and discussed options for making it available beyond the two year reauthorisation cycle. Their initial focus was on responses to alerts and alarms but they also recognised the usefulness of having information by vehicle type available covering sight lines and blind spots, prestart checks, emergency response e.g. fire suppression and emergency egress, and other general operating details. Consider working with business partners and adapting training materials to develop visual reference material that can be in equipment cabins and workplaces e.g. laminated cards, information cycling on videos etc. |
Confirmation that references are available in vehicles. Vehicle operator training and assessment records. Vehicle operation monitoring with by-exception reporting alarm and indicator panel reporting. By exception incident reviews. |
GMMHST2012-291 Engineering Manager to provide for constant monitoring and control of all hazardous equipment |
| BI-CPA.04.10 Site specific travelling speed information prepared for vehicle operators |
Site travelling speeds by vehicle type are documented and communicated in a style that is appropriate for the audience. |
Training modules for vehicle operators include specific information on travelling speeds by vehicle type for all relevant scenarios. Training should be assessed to ensure that personnel understand vehicle speed expectations:
The training information is provided in a format that is audience appropriate and available as a reference in the work area GHG Tarkwa Traffic Management Plan, Mining Operations Procedure, TGM 1.10.54 WI as approved for use 01-03-07 6.1.5. Speed Limits Maximum speed limit signs are located on all roads throughout the mine site. Every driver/ operator is responsible for ensuring that the posted speed limit is complied with. The maximum speed limit on all haulage roads in the mining area is 60km/h unless otherwise sign posted. The maximum speed limit in mine villages is 35km/hr unless sign posted otherwise. Drivers shall drive to condition at all times. Equipment and vehicles shall be operated and driven safely at a speed which is consistent with the prevailing site conditions (road and weather condition). Site conditions can vary considerably over a relatively short period of time, either because of changing weather conditions, reducing visibility or by road conditions deteriorating; reducing traction or becoming more slippery or because of the volume of traffic which accelerates wear and tear on bends and other areas where braking takes place. Compliance to speed limits on-site and off-site shall be tracked via GPS units installed in Gold Fields Tarkwa Mine vehicles and on-site for Contractors. |
Training and assessment of vehicle operator understanding of safe travel speeds by vehicle type for a range of scenarios and conditions. Mobile equipment operators are aware of travel (and operating) speeds and this information is regularly reinforced. |
Vehicle operator training and assessment records. Confirmation that work area references are available. Vehicle operation monitoring with by-exception speed reporting. By exception incident reviews. OFI-135 Review speed limit communication and enforcement. Workshop participants discussed incidents cause by speeding at Tarkwa including vehicle roll overs and slides. They also consider situations where vehicles travelling too slowly have caused traffic issues on both access and haul roads. Slow moving vehicles generate driver frustration and potential for higher risk driving manoeuvres. Speeding above limits increase the likelihood of vehicles losing control. Review site processes for communicating, monitoring and reinforcing the requirements to travel at zoned speeds and adjust for conditions and circumstances. |
GMMHST2012-097 Vehicles to be operated at safe speeds in a safe manner |
| BI-CPA.04.11 Site clearance requirements and processes for accurately estimating distances – information prepared for Operators |
Site clearance requirements are documented and communicated in a style that is appropriate for the audience. |
Training modules for vehicle operators and personnel who routinely work around mobile equipment includes specific information on required separation distances and clearances:
Specific information examples usually include using road delineators to calibrate following distances, and site practices for positioning near dig units, dumping, interactions with dozers, dumping into hoppers, road works, parking, when to use spotters (operating in restricted spaces), etc. The information is provided in a format that is audience appropriate and available as a reference in the work area. |
Training and assessment confirms that vehicle operators understand site clearance and separation distance requirements for all operational scenarios and conditions. Training and assessment confirms that personnel who work around mobile equipment understand all relevant site clearance and separation distance requirements. |
Vehicle operator training and assessment records. Confirmation that work area references are available. Vehicle operation monitoring and reporting using proximity detection technology. By exception incident reviews. |
|
| BI-CPA.04.12 Give way requirements information prepared for mobile equipment operators and pedestrians |
Site give way, and right of way requirements are documented and communicated in a style that is appropriate for the audience. |
Training modules include specific information on site give way and right of way requirements. The information is provided in a format that is audience appropriate and available as a reference in the work area.
|
Training and assessment records confirm that vehicle operators and personnel who work around mobile equipment understand site give way requirements for vehicle interactions relevant to their role. At a minimum this includes understanding site give way requirements for:
|
Vehicle operator training and assessment records. Confirmation that work area references are available. Vehicle operation monitoring and reporting using proximity detection technology and geofencing records. By exception incident reviews. |
|
| BI-CPA.04.13 Minimum requirements for parking in any situation – information prepared for operators |
Site requirements for parking in any situation are documented and communicated in a style that is appropriate for the audience. |
Training modules for vehicle operators include site specific parking requirements for all scenarios covering:
The information is provided in a format that is audience appropriate and available as a reference in the work area. GHG Tarkwa Traffic Management Plan, Mining Operations Procedure, TGM 1.10.54 WI as approved for use 01-03-07 provides comprehensive details in site parking requirements in Section 6.3.7. Parking. This covers:
|
Training and assessment confirms that vehicle operators understand:
OFI-153 Review in pit parking planning and practices. Workshop participants advised that restrictions in mine working areas leads to narrow access roads, confined work areas, frequent interactions between workgroups, poor siting of light vehicle parking areas, and sometimes an absence of parking. Poorly parked mobile equipment creates vehicle interaction hazards e.g. when heavy mobile equipment departs from a parked position. Confirm that parking area planning and design processes are adequate and monitor in pit parking practices. |
Vehicle operator training and assessment records. Confirmation that work area references are available. Workplace inspections of parking practices. Vehicle operation monitoring and reporting using proximity detection technology. By exception incident reviews. |
DP05-02.02 Allow for fundamentally stable parking |
| BI-CPA.04.14 Managing road works, including grader operations – information prepared for operators |
Information on managing road works is documented and communicated in a style that is appropriate for the audience. |
Training modules for vehicle operators include specific information on road maintenance hazards and controls covering:
The information is provided in a format that is audience appropriate and available as a reference in the work area. |
Vehicle operator training and assessment confirms managing road works across the full range of scenarios and conditions, including grader operations, is well understood and applied. Road work briefings and with update communications take place before and across shifts. |
Vehicle operator training and assessment records. Confirmation that work area references are available. Workplace observations during road maintenance. Vehicle operation monitoring and reporting using proximity detection technology. By exception incident reviews. OFI-129 CAS Project to include providing CAS data to augment current inspection processes. Workshop participants report that there are adequate Tarkwa mine procedures, processes, and operator training for managing interactions between road maintenance crews and operations. While the application of processes to manage interactions can be observed and assessed, this observation performance measure is at best periodic. Explore if CAS technology can be used to identify the subset of vehicle interactions between road maintenance vehicles and operations mobile equipment (and light vehicles). If it can, consider the value of developing performance measures for interactions with road maintenance equipment. |
|
| BI-CPA.04.15 Minimum requirements for hazard notification and demarcation – information prepared for operators |
Information about site standards for hazard notification and demarcation, are documented and communicated in a style that is appropriate for the audience. |
Information about the full range of hazard notification and demarcation approaches used at site is documented and provided to operators in training modules, awareness updates, and in reference resources. The information provided uses real scenarios and details expected responses. Examples of hazard notification and demarcation can include:
Scenarios may include:
The information is provided in a format that is audience appropriate and available as a reference in the work area.
|
Training and assessment for vehicle operators confirms that they understand general road network safety features, including:
|
|
GMMHST2012-092 Inspections and response required around all loose material, filled benches or degrading of berms GMMHST2012-111 Stockpiles can not be filled and reclaimed at the same time and location. Chutes to be designed and maintained to allow free flow of material |
| BI-CPA.04.16 Minimum requirements for windrows (bunds) – information prepared for operators |
Information about site standards for segregation windrows (bunds) is documented and communicated in a style that is appropriate for the audience. |
Training modules and awareness updates for vehicle operators covers road network safety features including the different size and types of windrows (bunds) in use for:
The information is provided in a format that is audience appropriate and available as a reference in the work area.
|
Training and assessment for vehicle operators confirms that they understand general road network safety features, including
|
Vehicle operator training and assessment records. Confirmation that work area references are available. Workplace hazard reporting by vehicle operators. By exception incident reviews. |
GMMHST2012-090 Plan for safety and protection of workers from slopes with Berms, scaling, working to avoid falls from or onto, constructing smooth walls, and manage other threats |
| BI-CPA.04.20 Sight lines and blind spots – information prepared for people who work around vehicles. |
Sight line and blind spot information, by vehicle type, is documented and communicated to personnel who work around mobile equipment. |
Training modules include specific information on operator vision limits and sight lines for the vehicles in use. The information is provided in a format that is audience appropriate and available as a reference in the work area.
|
Training and assessment for people who work around mobile equipment covers limits on vision, from the equipment operator position. Personnel who interact with mobile equipment are aware of vehicle sight lines and blind spots by type and this information is regularly reinforced. |
Confirmation that work area references are available. Records of topics covered at inductions, training, pre-shift meetings, near miss reviews etc. Interaction monitoring with by-exception reporting from vehicle cameras and collision avoidance technology. |
|
| BI-CPA.05.01 Skilled and experienced personnel are accountable for maintaining mobile equipment |
All workers who maintain mobile equipment are trained, competent and authorised for the tasks that they carry out. |
Mobile equipment maintainers are trained and competent for the tasks that they undertake, including:
|
OFI-167 Review process that confirm mobile equipment is ready for use after maintenance. Workshop participants discussed challenges for recruiting and retaining experienced maintainers. Examples include experienced site drill fitters being offered international roles. A lack of skilled and experienced maintenance staff has consequences including increases in equipment down time and the likelihood of defective equipment being returned to operations. Performance measures include equipment availability, early breakdowns, fires, and equipment failures that can cause vehicle interaction incidents. Review and confirm that business partner processes to confirm that mobile equipment is ready for use after maintenance are adequate. Consider a review of recruitment and retention processes for equipment maintainers. OFI-155 Review processes for managing equipment breakdowns and field repairs. Workshop participants advise that broken down equipment in the operating environment is often not secured and protected. Also significant in-pit repairs are carried out at Tarkwa by the Business Partners. Broken down equipment parked on, or being repair beside, hauls roads creates vehicle interaction hazards. There are a range of well established controls that include communication, demarcation, and longer term protection using earth bunds etc. Review, update and train personnel in understanding how to apply site standards to manage broken down equipment. Confirm that supervisors monitor that controls are in place and make corrections when required. |
OFI-143 Review technician numbers on shift Workshop participants discussed frequent occasions when there are not enough technicians available on shift to perform repairs. Delayed repairs can lead to compromised equipment being put back into service. Review the manning levels for technicians on shift to confirm sufficient numbers are available. |
GMMHST2012-287 Maintenance Management Plans to include SOPs requiring energy Isolation and restoration of guards, covers, etc. before returning to operation GMMHST2012-365 Regular inspection of trackless electrical equipment |
| BI-CPV.08 Protocols for site induction and operating areas access |
Induction processes for people using the road network are in place and applied at operating sites. |
Induction training and underlying procedures and rules cover:
|
All personnel at and visitors to operating sites undertake inductions and these are recorded. Inductions clearly communicate minimum site standards. OFI-159 Review site communication processes including work area induction refresher frequency. Workshop participants discussed and confirmed that work area inductions and refreshers are carried out as needed i.e. not to a regular schedule. This has led to situations where personnel who work in the mine are not fully informed about hazards present, required controls and key contacts. Examples include road network changes and personnel changes. Review site communication processes, including refresher inductions, to confirm that information about hazards present and their controls is getting to personnel. |
Regular inspections and personal hazard awareness records are made – with non-conformance corrected or escalated as appropriate. Periodic reviews of site access logs confirm all personnel have required inductions |
GMMHST2012-062 Beacons to mark boundaries should not be constructed at night GMMHST2012-063 Temporary Beacons or signage can be used to mark lease boundaries GMMHST2012-090 Plan for safety and protection of workers from slopes with Berms, scaling, working to avoid falls from or onto, constructing smooth walls, and manage other threats GMMHST2012-112 No access to stockpiles being filled from above without isolating feed source and applying safe working at height measures GMMHST2012-294 Only authorised people to enter site, operate, or maintain machinery |
| BI-CPA.08.02 Equipment and PPE standards for entering operational areas – information prepared for all personnel |
Site standards for PPE, high visibility clothing, lights, communication equipment, alerting devices, and other items required in operational areas are documented and communicated in a style that is appropriate for the audience. |
Requirements for personnel visiting or working in operating areas are documented in a style that is appropriate for the audience. They provide details and illustrations covering minimum standards for PPE, high visibility clothing, lights, communication equipment, alerting devices, and other items required in operational areas. Personal Protective Equipment Guidelines No Ref V-00 19/01/2022 Pg 5 High Visibility Clothing required in operating areas |
Information on the minimum PPE and equipment standards before entering operational areas is provided at inductions and during training. Information detailing standards is communicated to all employees, contractors, and visitors. Mining Induction Review and Refresher Revised 16/05/2024 Slide 3 provides an overview of required PPEConsultant Comment – There is a difference in requirements between the Guidelines and the Induction Training (no high-viz stripe on trousers). |
By exception reporting, and investigation of circumstances where minimum PPE and equipment standards are breached. |
GMMHST2012-112 No access to stockpiles being filled from above without isolating feed source and applying safe working at height measures GMMHST2012-297 Clothing requirements to prevent entanglement GMMHST2012-298 Mine Manager to provide appropriate PPE GMMHST2012-559 Not wearing required PPE is an offence |
| BI-CPA.10 Task expectations are well communicated and reinforced over the work shift. |
Task performance expectations are clearly communicated at task allocation and then reinforced over the shift. |
Each shift there is a process to allocate tasks and reinforce task relevant mobile equipment interaction controls. There is further communication during the shift as tasks or conditions change. Where appropriate, visual information (photographs, maps of roadways, etc.) are used. |
Pre-shift meetings, and as required, communications are logged and monitored for quality and effectiveness. |
Records from pre-shift meetings and other relevant communications. Communication logs with individuals. |
GMMHST2012-111 Stockpiles can not be filled and reclaimed at the same time and location. Chutes to be designed and maintained to allow free flow of material |
| BI-CRA.09.20 Introduce technology that supports existing fatigue management approaches |
If new technology is introduced, it improves fatigue management by operationally integrating and enhancing existing processes. |
Apply relevant site and company relevant for complex socio-technology projects. OFI-102 Review and formalise escalating responses for operator alertness detected by OAS. Tarkwa Mine has installed Operator Alert System (OAS) technology and has an onsite monitoring control room. The technology and supporting processes are mature and fully operationally integrated at site. Workshop participants confirmed that OAS technology is a significant vehicle interaction control in continuous mining operation. However, their discussion and review of procedures that escalating responses based on lapses in operator alertness are not in the procedure and are not included in OAS operator training materials. There is a response protocol is detailed in poster format for OAS monitoring staff and is applied routinely. The Tarkwa OAS and supporting practices set a Gold Fields benchmark. Consider reviewing and updating all supporting procedures and training modules so that they capture site practice for responding to differing levels of alertness detected in-field personnel. |
Site and company reviews for technology that can support and enhance existing fatigue management approaches follows this sequence:
|
Project management reviews. Performance monitoring after technology implementation. |
|
| BI-CRA.09.21 Fatigue alert alarms |
When fatigue monitoring systems are fitted, they have an operator alert function |
Fatigue monitoring systems include a local alert function. OFI-102 Review and formalise escalating responses for operator alertness detected by OAS. Tarkwa Mine has installed Operator Alert System (OAS) technology and has an onsite monitoring control room. The technology and supporting processes are mature and fully operationally integrated at site. Workshop participants confirmed that OAS technology is a significant vehicle interaction control in continuous mining operation. However, their discussion and review of procedures that escalating responses based on lapses in operator alertness are not in the procedure and are not included in OAS operator training materials. There is a response protocol is detailed in poster format for OAS monitoring staff and is applied routinely. The Tarkwa OAS and supporting practices set a Gold Fields benchmark. Consider reviewing and updating all supporting procedures and training modules so that they capture site practice for responding to differing levels of alertness detected in-field personnel. |
The alert function is confirmed as working by equipment operators as part of prestart checks, and there is a defined defect management process. The site equipment maintenance strategy directs the servicing and maintenance of the installed technology. |
Prestart equipment check records. Site equipment maintenance records. |
DP05-02.07 Augment operators with integrated systems |
| BI-CRA.11.01 Supervisors and trainers provide clear performance management expectations by role |
Performance expectations for safe and productive outcomes are documented and communicated to all personnel. |
Performance requirements are detailed by role and are used for training and competency assessments. Supervisors continually review, reinforce performance expectations. Performance management processes provide feedback that supports safe and productive behaviours and corrects unsafe and non-productive behaviours. |
Employee training and assessment confirms understanding of site performance expectations for:
|
Training system and employee records confirm that all personnel understand the site performance expectations that are relevant to their role. |
GMMHST2012-044 Mine Manager to confirm duties performed by competent persons GMMHST2012-508 Supervisors to be effective communicators GMMHST2012-513 Certificates of competency can be cancelled for poor behaviour or discharge of duties GMMHST2012-534 At least one person in every section to have first aid skills GMMHST2012-550 Workers to take care and follow site rules and procedures GMMHST2012-551 No person to cause damage to safety related equipment, signs or systems GMMHST2012-559 Not wearing required PPE is an offence |
| BI-CTA.12.01 Pre-commencement and periodic medicals for mobile equipment operators |
Pre-employment and periodic medicals confirm that personnel meet position requirements. |
Personnel who operate mobile equipment have pre-commencement and periodic medicals to confirm that they can safely and productively carry their assigned tasks. Medicals are carried out by appropriately trained personnel with oversight from a physician. Medical assessments include all regulatory requirements.
|
For relevant positions, the site hiring and selection process includes a requirement for a medical assessment. Medicals are completed before position offers are made. A senior site manager has the accountability for the site process for organising and managing the results of employee periodic medicals. Medical assessments meet all regulatory requirements. |
Reviews confirm the site process is being applied Reviews confirm that the site process meets records management and privacy standards. |
GMMHST2012-512 Workers to have appropriate medicals and regular fitness checks GMMHST2012-539 Provide a health facility and doctor or make external arrangements |
| BI-CPA.01 Recruitment and Selection | Recruitment and selection processes effectively fill vacant roles with suitable candidates. |
There are documented recruitment and selection processes that meet site, company, and legislative requirements in place. The recruitment phase includes general processes with details that relevant to the vacant role.
The selection phase documents general processes with details that are relevant to the vacant role covering:
Interview discussions The processes described align with the good practice model and this is applied more for trades personnel (where turnover is higher). |
Application of the company recruitment and selection processes based on type of job role. |
Job descriptions. |
GMMHST2012-007 Provide contact information for Exploration and prepare an Exploration Operating Plan GMMHST2012-024 Notify changes in statutory personnel and keep records on site of all appointed persons GMMHST2012-033 Certified Mine Manager to be appointed GMMHST2012-036 Underground Managers, Mine Captains (Superintendents) and Shotfirers to hold certificates in order to be appointed GMMHST2012-037 Open Pit Managers, Superintendents, and Mine Captains to be qualified and appointed GMMHST2012-045 Shift Bosses and Mining Foremen to hold certificates of competency and first aid tickets GMMHST2012-465 (4g-7) Operators to be trained and authorised, loads are placed and moved safely. Vehicles to meet site specifications for safety, energy isolation, lights, indicators and flashing lights. Passengers to be in designed seats with restraints GMMHST2012-507 Minimum worker age is 18 GMMHST2012-508 Supervisors to be effective communicators GMMHST2012-509 Employee records and photographs to be created, maintained and shared with stakeholders as appropriate GMMHST2012-513 Certificates of competency can be cancelled for poor behaviour or discharge of duties GMMHST2012-534 At least one person in every section to have first aid skills |
| BI-CPA.02 Onboarding, orientation, and general induction processes | Onboarding, orientation, and general induction processes are in place and applied for new employees. |
There is a documented process that details how the site supports new employees when they join the organisation. It includes: Onboarding
Induction to Site
Competence, Training and Awareness HSMP 4.2 PR, Rev 12 4/6/2024 – provides guidance on designing training requirements and then providing and assessing skills to fulfill roles on site. |
Onboarding, orientation, and
general induction processes are adapted based on new employee job role.
Mining Induction 2024 – Provides an exhaustive coverage of hazards present and required controls for workers on site. |
Human Resources
records. Operational Control Procedure (Mining Induction) Assessment, V8, 19/03/2024 TGM 13.10.024 REC – Vehicle Operating skills assessed include speed of travel, separation distance, horn signals, towing, and use of spotters. |
GMMHST2012-098 No passengers without seat belts GMMHST2012-465 (4g-7) Operators to be trained and authorised, loads are placed and moved safely. Vehicles to meet site specifications for safety, energy isolation, lights, indicators and flashing lights. Passengers to be in designed seats with restraints GMMHST2012-507 Minimum worker age is 18 GMMHST2012-509 Employee records and photographs to be created, maintained and shared with stakeholders as appropriate GMMHST2012-511 Manager to train workers in how to comply with regulations GMMHST2012-515 Lease holder to develop a safe work practice code to protect against operational hazards in mining, engineering, or processing |
| BI-CTA.12.02 Medical support and rehabilitation of injured personnel | Workers whose health has been degraded are supported to return to full (or alternate) duties. |
|
OFI-166 Review RTW and rehabilitation processes Consultant Comment: Poor control of return to work processes can lead to impaired operators working on equipment. Workshop participants noted that medical support and rehabilitation processes present an opportunity for improvement on site. In particular the use of these processes when workers are returning from an injury (e.g. due to falls from equipment or impact from violent movements in cabins) can prevent recurrence of the injury. Review return to work and worker rehabilitation processes. |
|
GMMHST2012-512 Workers to have appropriate medicals and regular fitness checks GMMHST2012-538 First aider to treat and accompany any injured worker to further treatment GMMHST2012-539 Provide a health facility and doctor or make external arrangements |
| BI-EDA.22.01 Specifications for operator displays |
Appropriately consistent operator displays provide the information necessary for safe and productive outcomes. |
Note: where there is more than one driving position, the display should be similar at each. Key Source References:
|
Mobile equipment is assessed and approved for use by a competent person following the Introduction to Site processes. All vehicles in operating areas meet site requirements for consistent operator displays. The details of equipment being used are listed in asset registers. OEM provided asset documentation is added to Plant Safety File. Maintenance planners review introduction to site records and add work orders for the maintenance of key systems. OFI-116 Review mobile equipment cabin ergonomic standards. Workshop participants noted that the installation of aftermarket equipment screens in vehicle cabins is creating ergonomic problems and in some cases restricted emergency egress. Confusing displays and alarms lead to an increased cognitive load and increase potential for operator mistakes. Review and update cabin ergonomic and installation standards for each type of equipment in use at Tarkwa. |
Operator training and feedback on displays by equipment model and type. Introduction to Site documentation and records. OEM provided documentation covering display details are part of the Asset Plant Safety File and inform operator training. Maintenance reviews and investigations e.g. failure to act on vehicle alarm. HSMP 6.1 PR Performance Measurement and Monitoring Procedure – S6.13.5 Ergonomics – requirements for an Occupational Hygienist survey to be conducted. |
DP05-02.11 Provide for clear labelling |
| BI-MPA.76 Safe and Productive Movement of Loads |
Site load movements are well planned, and hazards are identified and managed. |
There are site processes in place for planning and managing materials and equipment load movements covering: Load movements
Hazardous materials transport
SAFE LOADING, TRANSPORTATION AND UNLOADING OF VEHICLES, Ver 6 2/1/23, Ref TGM 2.10.013 WI – Points cover safe loading, load distribution, load size and shape, and vehicle operation OFI-100 Review site processes for managing non-standard loads. Workshop participants discussed site processes and practices for the safe movement of non-standard loads. They identified gaps in how operators are informed and the application of required controls for managing non-standard loads. Review site documentation for movement of loads and associated training modules and confirm that control advice is adequate e.g. maintaining load stability for wet bulk loads, load placement, route planning, use of escorts, the role of spotters when reversing etc. |
Personnel apply site processes to plan and execute safe and productive load movements. Personnel involved in the movement of loads understand their accountabilities and are authorised to apply site processes for:
OFI-174 Review linking VIMS overload capability to dispatch Failing to gather, transfer and act on information about loads being carried by haul trucks can result in equipment damage, vehicle over-speeds, and unwanted vehicle interactions e.g. through spillage, mobile equipment breakdown etc. Workshop participants identified that the Tarkwa Mine vehicle information management system (VIMS) has the capability to inform maintainers of overload conditions but this system is not yet linked to the dispatch system. Consider linking VIMS to dispatch so that overloading situations and trends can be monitored and notified to effectively manage overloading. OFI-156 Review site towing practices. Workshop participants advised that there have been incidents when towing broken down equipment from the pit. Inadequate towing practices can result in equipment under tow run aways and uncontrolled interactions on the road network. Review site towing practices, confirm that both business partners have approaches that meet site standards. |
Load movement plans are documented and logged. By exception equipment damage and incident investigation findings. Hazardous material movement audits. Transport equipment maintenance records e.g. barriers remain in place |
GMMHST2012-105 SOPs to be established for truck loading GMMHST2012-109 Stockpile Management to include SOPs for building and reclaim of material GMMHST2012-321 Engineering Manager to implement Lifting and Craneage System so loads are secured whilst in motion and during transport |
| BI-CTA.12.02 Medical support and rehabilitation of injured personnel | Workers whose health has been degraded are supported to return to full (or alternate) duties. | 4. Medical providers and site based rehabilitation officers support the recovery of injured workers 5. Alternate duties are identified as required to support an injured worker transition back into their original role 6. Permanently impaired workers transition to alternate site based roles or leave the site to obtain off-site employment and care . | · When an incident occurs where a worker is injured the site rehabilitation officer engages with medical services to support a return-to-work process and document the requirements as a return-to-work plan · Injured workers follow their return-to-work plan whilst they are continuing to recover · Fully healed workers return to full time duties · Workers who can not return to their original roles are guided to alternate site, or off site, roles and treatment programs | 5. Medical and rehabilitation reports are prepared by the return-to-work coordinator for review by senior leaders 6. As required the Human Resources Manager or other leaders intervene to support a worker transitioning to alternate roles, employment, or care 7. Records of injury outcomes are provided to relevant stakeholders for tracking and reporting | · GMMHST2012-512 Workers to have appropriate medicals and regular fitness checks · GMMHST2012-538 First aider to treat and accompany any injured worker to further treatment · GMMHST2012-539 Provide a health facility and doctor or make external arrangements |
This group of business inputs focuses on ensuring:
The following table presents the equipment related business inputs (BI), together with identified Opportunities for Improvement (green) and the relevant clauses of Ghanaian statute addressed by the BI.
| BI Name | BI Expectation | Specify | Implement | Monitor | Ghanaian Mining Legislation |
|---|---|---|---|---|---|
| BI-CPA.04.06 Tyre hazard awareness for all personnel. |
Tyre hazards and their controls are documented and communicated to all personnel, based on their role. |
Awareness and training information provides information on tyre hazards and their controls covering: Mobile Equipment Operations
Awareness and training material is illustrated with information about actual incidents and is based on organisational role. |
Tyre hazard and control material is prepared for a range of organisational roles. There is training and assessment for mobile equipment operators on tyre management including emergency response. General tyre hazardous awareness information is part of site and operating area inductions. Awareness material on tyre hazards and their controls is documented and used for pre-shift and safety meetings etc. |
Vehicle operator training and assessment confirms that tyre hazard management and controls are well understood and applied for general operations and in emergencies. Induction and awareness records confirm that all personnel are aware of tyre hazards and their controls appropriate to their role. |
GMMHST2012-300 Hot work permit system to be implemented |
| BI-EDA.26.05 Standards that set minimum requirements for cabin integrity, restraints, access and escape, auto shutdowns and other relevant protective systems |
Equipment selected for site use is fit for purpose and delivers safe and productive outcomes. |
Mobile equipment specifications are in place that include requirements for:
|
Senior managers including representative of operations and maintenance approve equipment selection recommendations. A rigorous introduction to site process checks that received mobile equipment meets site requirements before it is permitted to operate. |
All equipment in use is approved and documented. The details of equipment being used are listed in asset registers. OEM provided asset documentation is added to Plant Safety File. Maintenance planners review: introduction to site records and add work orders to maintain site standards. |
GMMHST2012-098 No passengers without seat belts GMMHST2012-465 (1-4f) Vehicles to meet site specifications for safety, cabin integrity, and identified (decals). Operators to be trained and authorised to operate, move and monitor vehicles on site GMMHST2012-466 Truck Cabs to be ergonomic, ROPS and FOPS rated, have safe access and egress, and consider towing requirements |
| BI-EDA.29.01 Mobile equipment operator interfaces consider ergonomics and cognitive loading |
Information provided by screens, control panels, alerts, alarms, and other installed devices assists mobile equipment operators to deliver safe and productive outcomes. |
There is a site process that considers cab ergonomics when installing screens, control panels, alerts, alarms, and other devices that:
The site process also reviews changes in cognitive load for mobile equipment operators covering:
|
The site process is applied when selecting, trialling, and installing screens, control panels, alerts, alarms, and other devices. OFI-116 Review mobile equipment cabin ergonomic standards. Workshop participants noted that the installation of aftermarket equipment screens in vehicle cabins is creating ergonomic problems and in some cases restricted emergency egress. Confusing displays and alarms lead to an increased cognitive load and increase potential for operator mistakes. Review and update cabin ergonomic and installation standards for each type of equipment in use at Tarkwa. |
Records of the site process being applied. Logs and records that demonstrate the installed device and interface is being used as designed. Operator feedback. |
GMMHST2012-465 (1-4f) Vehicles to meet site specifications for safety, cabin integrity, and identified (decals). Operators to be trained and authorised to operate, move and monitor vehicles on site GMMHST2012-466 Truck Cabs to be ergonomic, ROPS and FOPS rated, have safe access and egress, and consider towing requirements |
| BI-EPA.26 Fit-for-purpose equipment selection and Introduction to Site processes |
Equipment selected for site use is fit-for-purpose and delivers safe and productive outcomes – meeting all site requirements for worker ergonomics, control integrity, matched technology (to site), equipment performance and operating environment constraints. |
Sites have an equipment selection process that involves maintainers and operational personnel in a team review (Risk Assessment format) and uses asset specifications when:
Equipment specifications ensure that mobile equipment assets meet site production and operating environment demands (including provision of systems for monitoring location (including geofencing), communicating and visibility/sight lines). The specifications also cover the use of ancillary equipment such as forklifts, scissor lifts, elevating work platforms etc. and considers suitability for the operating environment (stability, use of quick detach systems, character of the material being transported, temperature ranges, etc.) Equipment specifications include allowance for all safety related functions such as energy constraint (guarding), removal of energy (isolation), and protection against unwanted operation. Information on equipment use limitations from the OEM should be provided to the operators/maintainers with training modules that also check for understanding. GHG Tarkwa Traffic Management Plan, Mining Operations Procedure, TGM 1.10.54 WI as approved for use 01-03-07 6.2.1. Vehicle Selection All mobile equipment used on site shall be safe and suitable for use under the working conditions in which they were engaged. Prior to operating any mobile equipment on site, a competent person shall assess the equipment/ vehicle to ensure it meets the vehicle’s and driving standards. Specialists shall be employed to certify specialized equipment before use. Selection of vehicles shall take account of the activities they are intended to perform and the risks to operators and maintainers. All newly acquired equipment and vehicles shall be risk assessed for adequacy before being certified for use on site at Mine Maintenance. All mobile equipment shall comply with any relevant statutory requirements and shall be properly operated and maintained in accordance with the manufacturer’s operating recommendations. Designated mining equipment shall be equipped with fatigue detection equipment (Guardvant) and Collision Avoidance System must be functional during use. A vehicle shall not be operated on site unless it complies with the following minimum vehicle standards (refer to Vehicle Roadworthiness Guideline for more information): OFI-148 Review Technology Specifications for Equipment Introduction to Site Mobile equipment selected and introduced to site is an accountability of Tarkwa Business Partners with Gold Fields oversight. There is also a requirement to notify the regulator. Gold Fields are supplying their Business Partners with
additional technology that will be deployed in their vehicles. The technology
includes Hexagon Mining Collision Avoidance Systems (CAS), operator alertness
systems (OAS), and fleet management. Confirm technology post installation specifications relevant to these systems and include installation standards. OFI-138 Investigate automated shutdown options for extended equipment idle periods. Tarkwa mine has an energy saving approach that includes limiting mobile equipment idle time. Review feasibility of automated equipment shutdown during long idle periods. Discuss with contractors and include in equipment specifications. OFI-132 Review site equipment specifications for key system alarms. Workshop participants discussed detection and warning systems capability on mobile equipment e.g. alerts and alarms for key systems such as brakes, steering and wheel assemblies e.g. tyre pressure. There have been incidents at Tarkwa where failures in
mobile equipment systems have caused vehicle interactions. Consider reviewing site equipment specifications for alerting and alarming capability for key systems e.g. brakes, steering, wheel assembly conditions etc. |
Senior managers including representatives of operations and maintenance approve equipment selection recommendations. A rigorous introduction to site process checks that received mobile equipment meets site requirements before it is permitted to operate. This includes ensuring that site requirements are met for:
OFI-140 Confirm that site vehicle identification standards are understood and applied. Workshop participants confirmed that some vehicles in use do not have identification numbers in place. They also noted that this is a legal requirement in Ghana. Vehicle identification is essential for communication. Confirm site standards, review vehicle numbering and lights for conformance and correct as required. |
Maintenance strategies confirm the status of all mobile equipment and associated infrastructure systems. Safety related components/checks are addressed with additional rigour (e.g. proof test requirements) with status reports available to senior personnel. Equipment specifications are regularly reviewed, and if required after significant incidents. |
GMMHST2012-043 Document and Information Control required for all Regulator correspondence, certificates of proof testing (boilers, ropes, load bearing members etc.), medical records, qualification and training records, and be made available to authorised GMMHST2012-085 All access ways to be safe GMMHST2012-103 Brakes on equipment to be effective and maintained with regular usage and proof testing GMMHST2012-104 Vehicle markings and lights to be visible, cabins to be ROPS and FOPS, horns to be audible, and flashing lights and flags to be in place and maintained GMMHST2012-289 All safety devices to be rated, and protection relays or stop switches to be effective GMMHST2012-290 Engineering Manager to select appropriate equipment and confirm skills of operators and maintainers GMMHST2012-299 Equipment to allow for Tag Out Lock Out systems and have a Lock control system GMMHST2012-303 Start up warnings required for moving machinery GMMHST2012-353 Engineering Manager to have systems to specify, implement, and maintain electrical equipment GMMHST2012-363 Electrical protection for motors GMMHST2012-465 (1-4f) Vehicles to meet site specifications for safety, cabin integrity, and identified (decals). Operators to be trained and authorised to operate, move and monitor vehicles on site GMMHST2012-465 (4g-7) Operators to be trained and authorised, loads are placed and moved safely. Vehicles to meet site specifications for safety, energy isolation, lights, indicators and flashing lights. Passengers to be in designed seats with restraints |
| BI-EPA.27.50 New or upgraded technology specification, test, and commissioning process. |
The operational deployment of new or upgraded communications equipment and technology is well managed. |
There is a site standard for selection, testing, and operational deployment of new or upgraded communications equipment and technology. It is supported by site processes and protocols for technology selection that require:
|
New or upgraded communications and technology is tested and commissioned before being operationally deployed. Selected technology testing, pilots, reviews, and operational deployment approaches include:
|
An approved project management plan for the operational deployment of new or upgraded communications equipment and technology. |
|
| BI-EPA.30.01 Mobile equipment is speed limited |
If required, mobile equipment is reliably speed limited. |
Where site speed limit governing of mobile equipment is required, specifications are set considering:
Tamper proof and tamper evident requirements
|
Speed limiting of mobile equipment that meets site requirements is confirmed at each step of the:
|
Site speed limiting specifications are in place and applied and captured in mobile equipment safety files. Equipment prestart checks and defect reports By exception – speed limiter compromises detected during periodic maintenance are reported and investigated |
|
| BI-EPA.30.05 New to site mobile equipment meets specifications for vehicle lights, signage, and markings. |
All vehicles in operating areas meet site specifications for lights, signage, and markings. |
The Introduction to Site process confirms that mobile equipment specifications for:
Apply when:
|
Mobile equipment is assessed and approved for use following the Introduction to Site processes. All vehicles in operating areas meet site requirements for:
|
Mobile equipment approval for site use records for mobile equipment. Maintenance records e.g. replacement of non-standard components post mobile equipment deployment. By exception reporting of non-conformance of operating mobile equipment. Regular mobile equipment operational and maintenance audit findings. |
GMMHST2012-104 Vehicle markings and lights to be visible, cabins to be ROPS and FOPS, horns to be audible, and flashing lights and flags to be in place and maintained GMMHST2012-465 (1-4f) Vehicles to meet site specifications for safety, cabin integrity, and identified (decals). Operators to be trained and authorised to operate, move and monitor vehicles on site |
| BI-EPA.31.01 Maintenance of safety and operational systems on mobile equipment |
Safety and operational systems on mobile equipment are maintained to a schedule and repaired when they breakdown. Mobile equipment with compromised safety and operational systems does not operate. |
Maintenance strategies in place for all mobile and related plant based on OEM requirements for inspections, replacement and lubrication of components. Work on safety systems includes proof testing where appropriate e.g. after maintenance on brakes and steering systems, for exhaust gas levels, emergency stop functions, etc. Faults detected at prestart checks and during operations are classified and prioritised for maintenance as a defect management process. Fault types where equipment should not be used and the process to follow in this situation are well defined. |
Maintenance planners issue work orders for mobile plant in line with confirmed strategies, containing checklists, instruction, procedures, and guidance for records to be prepared and submitted on completion of the work order. Maintenance workers conduct work order tasks in line with site requirements (which may extend beyond OEM procedures). Completed work order records are returned to the maintenance planners for permanent storage. Senior engineering and operational personnel review records to confirm maintenance strategy meets site requirements. OFI-144 Review effectiveness of maintenance backlog management processes. Workshop participants indicated that there are problems with the maintenance backlog system and incomplete mobile equipment tasks are not being rescheduled as required. The backlog system used by maintenance planners is currently not working effectively. Confirm if the issue is relevant for both Business partners and the review maintenance systems to confirm backlog issues are being managed and tracked through to resolution. OFI-142 Review priorities set and planning for maintenance tasks. Workshop participants reported that maintenance windows for equipment are frequently shortened due to production demands or lack of required components. Incomplete maintenance works can lead to failures of key systems and unplanned breakdowns. Review the use of component kits which confirm all required components and consumables are held before commencing a service. Also, review the priorities for maintenance tasks and consider how to effectively quarantine the maintenance windows from short term production requirement pressures. OFI-121 Review and update site standards for headlights. Workshop participants advise that the new replacement LED bulbs create more shadows than the traditional bulbs Roads obscured by shadows can lead to an inability to detect rough road conditions. Conduct a lighting survey for the different available headlight bulb types and adopt the best as a site standard. This should confirm that all new-to-site and refurbished equipment meets the requirement to provide sufficient light intensity and contrast. |
Equipment availability metrics. Reports on maintenance work order close out are prepared by maintenance planners for review by senior personnel Metrics on the status of safety related work orders. Reviews and investigations after significant maintenance failures. OFI-143 Review technician numbers on shift Workshop participants discussed frequent occasions when there are not enough technicians available on shift to perform repairs. Delayed repairs can lead to compromised equipment being put back into service. Review the manning levels for technicians on shift to confirm sufficient numbers are available. |
GMMHST2012-287 Maintenance Management Plans to include SOPs requiring energy Isolation and restoration of guards, covers, etc. before returning to operation GMMHST2012-365 Regular inspection of trackless electrical equipment GMMHST2012-465 (4g-7) Operators to be trained and authorised, loads are placed and moved safely. Vehicles to meet site specifications for safety, energy isolation, lights, indicators and flashing lights. Passengers to be in designed seats with restraints |
| BI-EPV.40 Mobile Equipment data send |
When sensors that monitor equipment components and systems have been fitted, the data is utilised to improve and sustain performance. |
When sensors and monitoring systems for equipment components and systems have been fitted, the data is utilised to improve and sustain performance. Site infrastructure requirements for data transfer are specified. Onboard and off-board data capture, transfer, and storage are specified e.g. tyre pressure and temperature, acceleration, braking, engine revs, speed, strut pressure, alarm status etc. Specifications for how equipment data is aggregated, sorted, monitored for drift, reported, and analysed are in place. |
On-board systems monitor equipment usage, data is transferred via site infrastructure. The data is aggregated and sorted so that it can be used for performance monitoring, reporting, and analysis. OFI-114 Improve implementation of consistent fleet ID across site systems. The Tarkwa VICE review confirmed that fleet identification for vehicle types is not always available and may be inconsistent. Without adequate knowledge of vehicle types then unwanted proximity alarms may be generated. Further define the issues and work with the technology provider to resolve how fleet IDs are loaded and tracked inside and across multiple systems. Establish agreed points of truth and checks. OFI-115 Improve quality of data networks on site. Workshop participants noted that there are frequent disconnects due to poor signal and network challenges around the Tarkwa operations. With loss of signal the ability for dispatch to contact and advise operators of responses to alarm states is impaired. Improve quality and reliability of site data networks to support timely and reliable alarm responses. |
Accurate, timely, and tailored reports on equipment usage and performance are provided to operators, supervisors, mine planners, maintenance personnel, training, and management. Reports are reviewed and performance drifts are identified and corrected. |
|
| BI-EPV.40.01 Local and remote failsafe for sensors, alarms, and installed safety devices. |
Sensor and alarm faults for equipment components, systems, and installed safety devices are detected with local notification, data capture and fault information send. |
There are specifications for fault reporting from sensors, alarms, and safety devices installed on mobile equipment. The specifications include requirements for local notification, data capture and fault information send. The specifications confirm fault priority and category and required action. When monitoring systems for equipment components alarm or safety devices are compromised, this data is captured and is sent for analysis and review. OFI-131 Update equipment defect management processes to include alarms. Workshop participants discussed the benefits of extending defect reporting and Business Partner maintenance management systems to include installed technology alerts and alarms. This includes developing protocols to operate when alarms and alerts are defective. Undetected non-functional alarms on operating mobile equipment present significant hazards for operators who assume the alert and alarm are operating. Review the defect management system and associated training to address how to react to defective monitoring and alarm systems. Review failsafe and detection notification with technology providers and confirm that it meets site requirements. |
When monitoring systems for equipment components alarm or safety devices are compromised there is local notification and relevant fault data is captured, transmitted off vehicle. The data is transmitted, aggregated and sorted so that it is available to:
OFI-113 Review response processes for equipment alert and alarm notification. Workshop participants confirmed that machine state alerts, alarms, and other information is transmitted back to dispatch. Advice, instructions, and directions are then relayed back via dispatch to vehicle operators. This sequence can result in extensive delays and has resulted in equipment damage and ongoing operations with compromised systems. Review the current process for prompting operators about machine state alarms and consider the cost and benefits of other approaches. |
Accurate, timely, and tailored reports on fault reporting from sensors, alarms, and safety devices installed on mobile equipment are provided to supervisors, maintenance personnel, training, management, suppliers, contract service providers and others as required. OFI-118 Review frequency of mobile equipment alarm system checks Workshop participants discussed the frequency and adequacy of maintenance checks and testing of vehicle alarm and alert systems. They raised questions about consistency, quality, and scheduling of checks. Concerns were raised on alarm systems that do not fail-to-safe. They also recognised that defective or non-functioning alert and alarm systems during vehicle operations can result in significant incidents and equipment damage. Review site processes for checking and tests of mobile equipment alarms. Consider both OEM installed third-party technology alarms. |
GMMHST2012-363 Electrical protection for motors |
| BI-ERA.31.02 Inspection and maintenance of mobile equipment cabin integrity, restraints, access and escape, auto shutdowns and other relevant protective systems. |
The protective systems and safety related components of on-site approved mobile equipment remain functional. |
Maintenance strategies related to cabins, passenger restraints, access and egress, auto shutdown and other relevant protective systems are in place for all vehicles on site and include:
Replacement of components based on OEM schedule, recommendations, and site duty requirements. |
Work orders for equipment on site are completed in a timely manner covering:
Maintenance planners close out work orders when confirmed as completed and prepare regular status reports on work order status for equipment on site. OFI-144 Review effectiveness of maintenance backlog management processes. Workshop participants indicated that there are problems with the maintenance backlog system and incomplete mobile equipment tasks are not being rescheduled as required. The backlog system used by maintenance planners is currently not working effectively. Confirm if the issue is relevant for both Business partners and the review maintenance systems to confirm backlog issues are being managed and tracked through to resolution. OFI-123 Consider in-field maintenance inspections prior to planned services. The workshop participants discussed how mobile equipment maintenance inspections are carried in the pit before scheduled maintenance by Tarkwa Mine Business Partners. They confirmed that the practice is not routine. This sometimes results in defects not being repaired because all the maintenance requirements for a vehicle arriving for a service have not been identified. Consider the cost benefits of implementing a process for in-field maintenance inspections to assist with maintenance planning. |
Equipment availability metrics. Reports on maintenance work order close out are prepared by maintenance planners for review by senior personnel Metrics on the status of safety related work orders. Reviews and investigations after significant maintenance failures. |
GMMHST2012-465 (1-4f) Vehicles to meet site specifications for safety, cabin integrity, and identified (decals). Operators to be trained and authorised to operate, move and monitor vehicles on site GMMHST2012-466 Truck Cabs to be ergonomic, ROPS and FOPS rated, have safe access and egress, and consider towing requirements |
| BI-ERA.31.03 Inspection and maintenance of mobile equipment lights and markings |
Mobile equipment in use always meets category standards for lights and markings. |
Each category of mobile equipment has an approved standard for lights and markings. There are comprehensive site processes in place to apply and maintain this mobile equipment standard including:
GHG Tarkwa Traffic Management Plan, Mining Operations Procedure, TGM 1.10.54 WI as approved for use 01-03-07 provides details of site requirements for light types and use in section 6.2.1.1. Lights |
Inspection, defect reporting, repair and maintenance processes that consider lights and marking for mobile equipment are consistently applied. Prestart checks include:
OFI-144 Review effectiveness of maintenance backlog management processes. Workshop participants indicated that there are problems with the maintenance backlog system and incomplete mobile equipment tasks are not being rescheduled as required. The backlog system used by maintenance planners is currently not working effectively. Confirm if the issue is relevant for both Business partners and the review maintenance systems to confirm backlog issues are being managed and tracked through to resolution. OFI-140 Confirm that site vehicle identification standards are understood and applied. Workshop participants confirmed that some vehicles in use do not have identification numbers in place. They also noted that this is a legal requirement in Ghana. Vehicle identification is essential for communication. Confirm site standards, review vehicle numbering and lights for conformance and correct as required. OFI-121 Review and update site standards for headlights. Workshop participants advise that the new replacement LED bulbs create more shadows than the traditional bulbs Roads obscured by shadows can lead to an inability to detect rough road conditions. Conduct a lighting survey for the different available headlight bulb types and adopt the best as a site standard. This should confirm that all new-to-site and refurbished equipment meets the requirement to provide sufficient light intensity and contrast. OFI-123 Consider in-field maintenance inspections prior to planned services. The workshop participants discussed how mobile equipment maintenance inspections are carried in the pit before scheduled maintenance by Tarkwa Mine Business Partners. They confirmed that the practice is not routine. This sometimes results in defects not being repaired because all the maintenance requirements for a vehicle arriving for a service have not been identified. Consider the cost benefits of implementing a process for in-field maintenance inspections to assist with maintenance planning. |
|
|
| BI-ERA.31.04 Inspection and Maintenance of Mobile Equipment alarms, monitors, cameras, and other warning devices. |
Mobile equipment alarms, cameras and advice screens are functional during operations. |
Each category of mobile equipment has an approved standard for alarms, cameras, advice screens, and other warning devices. There are comprehensive site processes in place to apply and maintain this mobile equipment standard including:
|
Inspection, calibration, proof testing, defect reporting, repair, maintenance and other processes relevant to mobile equipment alarms, cameras, and in cabin monitors, and other warning devices are consistently applied. Prestart checks and infield calibration includes checking and reporting on the status of operator relevant alarms, cameras, advice screens, and other warning devices. OFI-144 Review effectiveness of maintenance backlog management processes. Workshop participants indicated that there are problems with the maintenance backlog system and incomplete mobile equipment tasks are not being rescheduled as required. The backlog system used by maintenance planners is currently not working effectively. Confirm if the issue is relevant for both Business partners and the review maintenance systems to confirm backlog issues are being managed and tracked through to resolution. OFI-123 Consider in-field maintenance inspections prior to planned services. The workshop participants discussed how mobile equipment maintenance inspections are carried in the pit before scheduled maintenance by Tarkwa Mine Business Partners. They confirmed that the practice is not routine. This sometimes results in defects not being repaired because all the maintenance requirements for a vehicle arriving for a service have not been identified. Consider the cost benefits of implementing a process for in-field maintenance inspections to assist with maintenance planning. |
OFI-118 Review frequency of mobile equipment alarm system checks Workshop participants discussed the frequency and adequacy of maintenance checks and testing of vehicle alarm and alert systems. They raised questions about consistency, quality, and scheduling of checks. Concerns were raised on alarm systems that do not fail-to-safe. They also recognised that defective or non-functioning alert and alarm systems during vehicle operations can result in significant incidents and equipment damage. Review site processes for checking and tests of mobile equipment alarms. Consider both OEM installed third-party technology alarms. |
GMMHST2012-291 Engineering Manager to provide for constant monitoring and control of all hazardous equipment GMMHST2012-303 Start up warnings required for moving machinery |
| BI-ERA.31.05 Inspection, calibration, maintenance, and updating of mobile equipment tools and speed measuring systems |
Mobile equipment maintenance tools, speedometers and other indicators are accurate. |
Key maintenance tools and measuring components on equipment are regularly calibrated, including:
Inspection, calibration and maintenance is scheduled in line with OEM or third-party provided nominated maintenance strategies. |
Work orders are raised and issued to achieve inspection and calibration of maintenance tools and speed measurement devices follows OEM or third-party provider schedule, recommendations. OFI-144 Review effectiveness of maintenance backlog management processes. Workshop participants indicated that there are problems with the maintenance backlog system and incomplete mobile equipment tasks are not being rescheduled as required. The backlog system used by maintenance planners is currently not working effectively. Confirm if the issue is relevant for both Business partners and the review maintenance systems to confirm backlog issues are being managed and tracked through to resolution. |
|
|
| BI-ERA.31.08 Inspection and maintenance of mobile equipment key systems, brakes, steering, and wheel assemblies |
Key mobile equipment systems and components such as brakes, electric drive propulsion elements, steering, and wheel assemblies do not fail without detection or warning. |
Each category of mobile equipment has an approved standard for key systems and components. There are comprehensive site processes in place to apply and maintain this mobile equipment standard including:
Defect reports, alarms, and non-conforming actions of operators and maintainers are analysed to consider additional inspections and maintenance, further operator training, and performance monitoring. GHG Tarkwa Traffic Management Plan, Mining Operations Procedure, TGM 1.10.54 WI as approved for use 01-03-07 provides details of site requirements for brakes in Section 6.2.1.2. Brakes. This includes a requirement for light vehicles accessing the mining operational area to undergo mandatory brake testing. |
Inspection, calibration, defect reporting, repair, maintenance, and other processes relevant to mobile equipment key systems are consistently applied. Mobile equipment prestart checks and in field testing check and report on the status of key systems. A defect reporting system is in place with clear guidance on the actions to be taken if mobile equipment key systems are compromised. OFI-144 Review effectiveness of maintenance backlog management processes. Workshop participants indicated that there are problems with the maintenance backlog system and incomplete mobile equipment tasks are not being rescheduled as required. The backlog system used by maintenance planners is currently not working effectively. Confirm if the issue is relevant for both Business partners and the review maintenance systems to confirm backlog issues are being managed and tracked through to resolution. OFI-123 Consider in-field maintenance inspections prior to planned services. The workshop participants discussed how mobile equipment maintenance inspections are carried in the pit before scheduled maintenance by Tarkwa Mine Business Partners. They confirmed that the practice is not routine. This sometimes results in defects not being repaired because all the maintenance requirements for a vehicle arriving for a service have not been identified. Consider the cost benefits of implementing a process for in-field maintenance inspections to assist with maintenance planning. |
|
GMMHST2012-043 Document and Information Control required for all Regulator correspondence, certificates of proof testing (boilers, ropes, load bearing members etc.), medical records, qualification and training records, and be made available to authorised GMMHST2012-103 Brakes on equipment to be effective and maintained with regular usage and proof testing GMMHST2012-287 Maintenance Management Plans to include SOPs requiring energy Isolation and restoration of guards, covers, etc. before returning to operation GMMHST2012-288 Engineering Manager to implement a Management System to achieve fit for purpose equipment and appropriate defect management |
| BI-ERA.31.30 Selection, inspection, and maintenance of radios and other communication equipment |
Operating sites deploy fit for purpose, effective, and reliable radios and other communication equipment. |
There is a site performance standard for site radios and other communication equipment There are comprehensive site processes that define:
|
Prestart checks, defect reporting, radio channel allocation, signal coverage, repair, maintenance, and other processes relevant to communications equipment are consistently applied. OFI-151 Review site processes and confirm that they are adequate to support required radio communications. Workshop participants discussed site processes and schedules for the routine checking of radios in mobile equipment. This includes prestart checks, defect reporting, and scheduled maintenance of radios and site infrastructure. It also incudes confirming minimum requirements for radios in heavy mobile equipment, service vehicles, light vehicles and for pedestrians. Surface mining operations typically deliver safe and productive outcomes using radios to support disciplined positive communications to manage interactions in working areas. Workshop participants report that radio faults do occur and that pre start and routine schedules for checking radios and communication infrastructure are inconsistent. Review site processes and confirm that they are adequate to support required radio communications. Involve Business Partners in the review. OFI-110 Review Tarkwa Communications Infrastructure and Radio Use. Workshop participants report that there are ongoing site issues with communication equipment, including competition for radio use, incorrect use of radios, and network blind spots in the mine. Effective radio and data communications are essential for safe and productive mine operations and cover positive communications and dispatch. Review radio use discipline, radio availability e.g. radios in light vehicles accessing the pit, network coverage etc. Establish site minimum standards. OFI-115 Improve quality of data networks on site. Workshop participants noted that there are frequent disconnects due to poor signal and network challenges around the Tarkwa operations. With loss of signal the ability for dispatch to contact and advise operators of responses to alarm states is impaired. Improve quality and reliability of site data networks to support timely and reliable alarm responses. |
Maintenance planners close out work orders when completed and prepare regular status and performance reports for communications equipment. Work orders for equipment repair are completed in a timely manner. |
|
| BI-ERA.31.50 Protocols for the calibration of measuring equipment |
Measuring and position monitoring equipment is inspected and calibrated. |
There is a site standard for the regular inspection, calibration, and upgrade management of measuring equipment. It is supported by site processes that detail:
|
Site personnel are trained, competent, and authorised to use measuring equipment for:
The training includes inspecting, testing, and confirming that measuring and position equipment is calibrated before use. OFI-119 Confirm and apply calibration requirements for VIMS speed monitoring Workshop participants discussed how vehicle speed at Tarkwa Mine is measured using VIMS. They noted recent concerns about the system calibration and accuracy so that there is confidence that reliable information is being captured and reported. Confirm and apply the minimum requirements for calibration of vehicle measuring systems. |
Reports on the calibration status of measuring equipment. Records confirm the competence of personnel undertaking measuring or surveying tasks. |
|
| BI-ERA.32.01 Operator pre-start checks include safety and operational components |
Equipment operators carry our prestart checks to confirm equipment can be operated and work area hazards are identified and managed. Equipment that is compromised does not operate. |
Equipment operators are competent and supported to carry equipment and work area prestart checks. Mobile equipment prestart checks include:
Faults detected at prestart checks and during operations are classified:
Work area checks include identifying and managing hazards from: Vehicle moving off; Obstacles; Road conditions; Weather (rain, wind (dust), other threats), and; Vision and sight line restrictions GHG Tarkwa Traffic Management Plan, Mining Operations Procedure, TGM 1.10.54 WI as approved for use 01-03-07 6.2. Mobile Equipment If any part of an item of mobile equipment or light vehicle is not fully operational, the machinery or vehicle is to be tagged out of service and the maintenance department informed. The equipment is not to be used until repairs are completed. 6.2.1.8. Radio Use All mine vehicles shall be fitted with radio and shall change to the Mining Operations channel when travelling in and around mining area. Any vehicle that does not have access to a radio capable of receiving channels must be escorted whilst on the haul roads and the Pit areas. Areas such as the Process Plant and construction sites where communication is required must be done through the 2-way radio system. OFI-134 Consider mandating fitted radios for all mine vehicles. Workshop participants discussed
situations where vehicles are routinely entering the mine without functioning
radios. Many personnel operating light vehicles in the pit use hand held
radios. Inability to contact other vehicles, or
be contacted, can lead to misunderstandings and cause vehicle collisions. Confirm the site equipment specifications requirements for fitted and functioning radios. Communicate site requirements and consider having radio checks when buggy whips are fitted to light vehicles. Reduce the reliance on portable radios e.g. to pedestrians and escorts. Consider mandating fitted radios on all mine vehicles. |
Equipment operators are trained, competent and authorised to carry equipment and work area prestart checks before operating equipment. Prestart checklists are prepared for each type of equipment. Prestart equipment and work area checks are logged. There is a site defect reporting and management system. Consultant Comment – Multiple incidents in the provided data set relate to wheels falling off during operations. the use of wheel nut indicators can reduce the potential for pre-use inspections to fail to detect loose or failing studs. OFI-133 Review site pre-start processes. Workshop participants advised that pre-start books are not always available. When they are not available they are not used and vehicles go into operation without a proper check. Failure to conduct appropriate pre-starts can lead to vehicle or key component failures during operations. Review site pre-start systems considering a potential to use a digital option with maintenance system connects rather than relying on printed paper books. |
Supervisors monitor the quality of operator prestart checks. Maintenance planners review prestart forms and raise work orders as required. Prestart records confirm that checks of work areas and key systems, including – communications, brakes, steering, tyres and running gear are completed. |
GMMHST2012-288 Engineering Manager to implement a Management System to achieve fit for purpose equipment and appropriate defect management GMMHST2012-289 All safety devices to be rated, and protection relays or stop switches to be effective GMMHST2012-365 Regular inspection of trackless electrical equipment |
| BI-ERA.32.07 Prestart checks of radio and other communication devices |
Prestart checks confirm that mobile equipment operators and people who work around mobile equipment can communicate. |
Mobile equipment operators and personnel who work around mobile conduct prestart checks that confirm:
There is a well-defined site defect management process to manage faults in communications equipment before and during operations. It includes what to do when there is a fault. |
Radio and other communication device users are trained in:
OFI-151 Review site processes and confirm that they are adequate to support required radio communications. Workshop participants discussed site processes and schedules for the routine checking of radios in mobile equipment. This includes prestart checks, defect reporting, and scheduled maintenance of radios and site infrastructure. It also incudes confirming minimum requirements for radios in heavy mobile equipment, service vehicles, light vehicles and for pedestrians. Surface mining operations typically deliver safe and productive outcomes using radios to support disciplined positive communications to manage interactions in working areas. Workshop participants report that radio faults do occur and that pre start and routine schedules for checking radios and communication infrastructure are inconsistent. Review site processes and confirm that they are adequate to support required radio communications. Involve Business Partners in the review. OFI-110 Review Tarkwa Communications Infrastructure and Radio Use. Workshop participants report that there are ongoing site issues with communication equipment, including competition for radio use, incorrect use of radios, and network blind spots in the mine. Effective radio and data communications are essential for safe and productive mine operations and cover positive communications and dispatch. Review radio use discipline, radio availability e.g. radios in light vehicles accessing the pit, network coverage etc. Establish site minimum standards. |
Training record reviews. Prestart records confirm that checks are completed. Supervisors monitor and coach on the quality of operator prestart checks. Maintenance planners review prestart forms and raise work orders as required. As required investigations of communication faults. OFI-147 Review Review Light Vehicle Prestart Process Light vehicle prestart checks are required and carried out at Tarkwa mine. Workshop participants report that LV prestart checks are generic and do not include installed technology and communications equipment. Also some forms are not submitted on time. Review Light Vehicle prestart check process, confirm that reporting and defect management processes are satisfactory. Confirm requirements for prestart checks for CAS and OAS technology and communications equipment. |
|
| BI-ERA.32.11 Prestart checks of mobile equipment alarms and monitors |
Prestart checks confirm that mobile equipment alarms, monitors and information panels are working. |
Mobile equipment operators conduct prestart checks, or monitor equipment self-checks, to confirm alarms, monitors, and information panels are working. There is a well-defined site defect management process to manage faults before and during operations. It includes what actions to take based on fault type. OFI-111 Include CAS and OAS Checks in Pre-Starts. Workshop participants discussed how Collision Avoidance Systems (CAS) and Fatigue Management (OAS) devices are checked before use. It is reported that CAS and OAS checks are not part of operator pre-start equipment checks. Review mobile equipment pre-start check process, consider opportunities to include OAS and CAS technology checks. Confirm fault categories and expected actions if faults or defects are reported. |
Mobile equipment operators are trained and competent in conducting and monitoring equipment prestart checks. This training includes:
|
OFI-147 Review Review Light Vehicle Prestart Process Light vehicle prestart checks are required and carried out at Tarkwa mine. Workshop participants report that LV prestart checks are generic and do not include installed technology and communications equipment. Also some forms are not submitted on time. Review Light Vehicle prestart check process, confirm that reporting and defect management processes are satisfactory. Confirm requirements for prestart checks for CAS and OAS technology and communications equipment. OFI-118 Review frequency of mobile equipment alarm system checks Workshop participants discussed the frequency and adequacy of maintenance checks and testing of vehicle alarm and alert systems. They raised questions about consistency, quality, and scheduling of checks. Concerns were raised on alarm systems that do not fail-to-safe. They also recognised that defective or non-functioning alert and alarm systems during vehicle operations can result in significant incidents and equipment damage. Review site processes for checking and tests of mobile equipment alarms. Consider both OEM installed third-part technology alarms. |
GMMHST2012-303 Start up warnings required for moving machinery GMMHST2012-363 Electrical protection for motors |
| BI-LRA.41.10 Construction, inspection, and maintenance of site infrastructure and fixed plant |
Site infrastructure and fixed plant remains structurally sound. |
There is a site standard for the construction, inspection, and maintenance of infrastructure and fixed plant. It is supported by comprehensive site processes for:
Site infrastructure and fixed plant remains structurally sound during normal operations and failures are managed if they occur.
|
Construction, inspection, and maintenance and other processes relevant to site infrastructure and fixed plant are consistently applied. A defect reporting system is in place with clear guidance on the actions to be taken if site infrastructure or fixed plant are compromised. |
Infrastructure and fixed plant inspection, maintenance, and repair reports. As required, investigations of infrastructure and fixed plant failures. |
GMMHST2012-065 Beacons and boundary marks to be maintained GMMHST2012-107 Dump and Stockpile Management Plans to be prepared covering construction, stability, environmental controls, and processes for certifying the pile as safe GMMHST2012-110 Dump construction and Operation System includes documented designs and operating procedures to prevent slumping, edge failure, or unwanted vehicle interactions |
| Name | BI Expectation | Specify | Implement | Created | Related Ghanaian Statute |
|---|---|---|---|---|---|
| BI-LDA.41.01 Road design guidelines set minimum standards for the construction and maintenance of the road network |
Site tailored road design standards support the delivery of safe and productive outcomes and are applied to construct and maintain haul roads, ramps, benches, loading and dumping areas, parking areas, access to service areas and other relevant infrastructure. |
The site road design specifications consider prevailing weather conditions, equipment in use, operator experience, available construction materials, tyre and equipment life, equipment maintenance, fuel usage, and productivity. Site road design guidelines provide tailored specifications for:
Accountabilities are assigned for the complete road network life-cycle: Preparing designs; Processes to achieve as-built sign-off; Roadway inspections; Scheduled roadway maintenance; Interim repair works; Decommissioning or moving to alternate uses. GHG Tarkwa Traffic Management Plan, Mining Operations Procedure, TGM 1.10.54 WI as approved for use 01-03-07 Section 6 Traffic Standard gives guidance on design, construction, layout, and key parameters such as pavement width, gradient and cross slope, edge protection, intersections (including round-abouts (circles)), and maintenance requirements. 6.1.2.7. Road Intersection Intersections shall be at 90 degrees and crossroad intersections shall be avoided, wherever possible. 6.1.2.8. Acceptable (preferred) intersection since the side road is at 90 degrees to the main road Round About This type of intersection shall be avoided wherever possible Roundabouts should regulate the intersection of no more than two roads wherever possible. All roads are given the same level of priority and traffic is to give way to the LEFT. This will be shown with roundabout YEILD signs placed on all approaches to the intersection. Roads should intersect at 90°. Major roads joining a roundabout will be divided down their centre line by a traffic island at least 5m long. OFI-141 Review, update, and apply the Tarkwa Traffic Management Plan GHG Tarkwa Traffic Management Plan, Mining Operations Procedure, TGM 1.10.54 WI was first approved for use on the 01-03-07. It is still current but has not been reviewed and updated since initial publication. It is a comprehensive document that confirms a range of site design and operating requirements that reflect good mine design and operating practice at Tarkwa. However, during the Tarkwa 2024 Vehicle Interaction Control Effectiveness (VICE) review, workshop participants identified misalignments between this key reference document and operational practice and conditions. These include:
These issues were confirmed by supporting consultants during mine tours and interviews. Consider a review of the Tarkwa Traffic Management plan in conjunction with the development of Gold Fields Minimum Standards for Vehicle interaction controls. At a minimum the review should revisit and update minimum requirements for:
|
Road networks (and excavations) are constructed following design guidelines and ‘as built’ is checked off against design before handover. Maintenance crews reference design guidelines during routine maintenance, repair e.g. after flooding and upgrades, to confirm that minimum standards are in place. Routine mine road housekeeping rapidly removes spillage, maintains good water drainage, repairs potholes, rutting and depressions. GHG Tarkwa Traffic Management Plan, Mining Operations Procedure, TGM 1.10.54 WI as approved for use 01-03-07 6.1.3. Road Maintenance and Repair Roads must be regularly maintained so that they do not develop bumps, ruts or potholes, which may make control of vehicles difficult or cause health problems due to whole-body vibration. OFI-163 Review Road Construction and Maintenance Standards Workshop participants report that haul road construction and maintenance is sometimes inadequate. Issues include steep ramps sometimes greater than 10%, rough ramps, substandard maintenance on haul roads. This situation increases equipment and tyre damage, slows production, and physically stresses operators. Confirm Tarkwa Mine road design standards and update processes to construct and maintain infrastructure to site standards. OFI-162 Review mine planning input to speed limits. Workshop participants discussed how and when mobile equipment speed limits are set during the mine planning and design processes. Incorrect speed limits can lead to vehicle over speed events e.g. when cresting and tyre overheating. Review and confirm the processes for setting site speed limits is considered during mine design and planning. OFI-157 Review road maintenance practices for vegetation control. Workshop participants confirmed that there are frequently tree branches close to roads or extending onto pavements. Branches and then other obstructions on roadways can lead to incidents occurring. Review and update road maintenance practices to include addressing encroaching vegetation and dead fall. |
In date and approved site road design guidelines and supporting resources. Sign-off records of as built and as maintained against design standards. Work area inspections non-conformance reports and analysis. CAS technology heatmaps and reports. Monitoring of equipment operators reporting and resolution of debris and deterioration. |
GMMHST2012-008 Prepare a Mining Operating Plan to receive an Operating Permit GMMHST2012-009 (3(j-m)-4) MOP to include rehabilitation plan and schedule, and other matters required by the Chief Inspector GMMHST2012-025 Survey prepared plans of all workings to be submitted to the Chief Inspector by the end of each calendar year GMMHST2012-058 Accurate Survey plans of all workings, geology, buildings, and features to be prepared, controlled and submitted to the Chief Inspector GMMHST2012-059 Use SI Measurements GMMHST2012-071 Natural features to be surveyed and included on plans GMMHST2012-073 Surveyor Signed and Dated plans to be submitted GMMHST2012-074 Plans to be fully detailed and accurate GMMHST2012-075 Plans to conform with any Regulator Rules GMMHST2012-077 No additional tracks during construction GMMHST2012-079 Avoid causing environmental damage when exploring GMMHST2012-082 Mine Design process to confirm stability (and monitoring), worker safety, blasting arrangements, and other factors GMMHST2012-083 Mine Designs and practices to include rigorous geotech analysis and identify considerations for nearby workings and final slope stability GMMHST2012-084 Road network to allow for safe vehicle operations addressing pavement quality and size, slope, curvature, cross grade, berms or windrows, and allow for emergencies (speed or fire) GMMHST2012-086 Adjoining leases to be mined so both are stable GMMHST2012-088 Design slopes with benches GMMHST2012-089 Maximum bench height to be within the reach of loading equipment GMMHST2012-091 Unconsolidated material to be dug within range of equipment GMMHST2012-107 Dump and Stockpile Management Plans to be prepared covering construction, stability, environmental controls, and processes for certifying the pile as safe GMMHST2012-109 Stockpile Management to include SOPs for building and reclaim of material GMMHST2012-110 Dump construction and Operation System includes documented designs and operating procedures to prevent slumping, edge failure, or unwanted vehicle interactions GMMHST2012-514 Warning Signs to be erected at lease boundary and areas of hazard |
| BI-LPA.42.04 Lighting, delineation and signs are installed and maintained to standards that meet minimum site road design requirements. |
There are minimum standards for the installation, inspection and maintenance of lighting, delineation, and signs that assist vehicle operators maintain situational awareness. |
Designs and construction requirements include standards for lighting of high traffic areas (e.g. around the mine infrastructure areas, vehicle (including remotely controlled) operating areas, dump edges, intersections, etc.) and signs to alert vehicle operators of road network requirements. Permanent signs are erected to provide warnings around fixed infrastructure and temporary signs or warning devices (traffic cones, barrier tape, etc.) are used around temporary work areas or road network hazards not yet repaired. |
Survey marks out the requirements for road network infrastructure to meet site requirements. Road construction crews place and maintain permanent and temporary lighting, communication and information signage around the road network. Work crews place demarcation and warning signage around their work areas and nominated access routes. ‘As built’ is checked off against design by operations. GHG Tarkwa Traffic Management Plan, Mining Operations Procedure, TGM 1.10.54 WI as approved for use 01-03-07 6.1.6. Traffic Signage Road signs are located on all roads throughout the site. They shall be obeyed at all times and apply to light and heavy vehicle drivers. Sufficient warning signs need to indicate potential dangers. Signs shall be kept clean and well-maintained so that they are always visible. No vehicle is to proceed beyond a no-entry sign or barricade unless the specific authorization of a supervisor has been obtained. OFI-141 Review, update, and apply the Tarkwa Traffic Management Plan GHG Tarkwa Traffic Management Plan, Mining Operations Procedure, TGM 1.10.54 WI was first approved for use on the 01-03-07. It is still current but has not been reviewed and updated since initial publication. It is a comprehensive document that confirms a range of site design and operating requirements that reflect good mine design and operating practice at Tarkwa. However, during the Tarkwa 2024 Vehicle Interaction Control Effectiveness (VICE) review, workshop participants identified misalignments between this key reference document and operational practice and conditions. These include:
These issues were confirmed by supporting consultants during mine tours and interviews. Consider a review of the Tarkwa Traffic Management plan in conjunction with the development of Gold Fields Minimum Standards for Vehicle interaction controls. At a minimum the review should revisit and update minimum requirements for:
OFI-173 Improve in pit lighting and monitor status. Poor levels of lighting and area lighting in the Pit on nightshift can lead to operator errors. Workshop participants discussed and confirmed regular situations where lighting in the pit areas is below standard. Review the standards for and practices around installing lighting towers and other area lighting in and around the pit. Consider developing across shift reports confirming lighting measurement status meets site standards. OFI-107 Improve site delineation processes and practices. Workshop participants discussed and
confirmed that delineators are not always visible around road network. Operators rely on the spacing of delineator to assist with
maintaining clearance when following other vehicles. Review current standard for installing delineators, compare with site practices for road construction, inspection, and maintenance. Consider developing a site program to improve and maintain delineation standards and other road network standards e.g. signage and lighting. |
Survey records. As built plans with sign-off. Workplace inspections. By exception incident investigations. |
GMMHST2012-514 Warning Signs to be erected at lease boundary and areas of hazard |
| BI-LPA.42.11 Competent and site experienced water cart operators |
Dust is well controlled without overwatering the road surface. |
Site performance requirements are in place for water cart operators so that dust is controlled without creating a slippery road. Performance requirements may include:
|
Mobile equipment operators provide feedback on dust control and overwatering. Supervisors monitor dust control watering operations. Trainers reinforce importance of watering and communication for water cart operators. |
Water cart operator performance assessment against site requirements for dust management without overwatering. By exception incident reporting. Digital reports from automated water carts. |
|
| BI-LPA.42.20 Infrastructure protection using barriers or warning devices. |
Site infrastructure is protected from unplanned contact with mobile equipment. |
When constructing roads near infrastructure, hazardous locations or work areas the documented requirements include placing windrows, bunds or physical barriers (designed to reduce injury threats if struck (i.e. rounded and/or frangible)) – and where these cannot be placed (e.g. for overhead lines) then warning devices (over height alarms, cable balls, geo fencing etc.), or vision enhancing components (mirrors, translucent ventilation curtains etc.) are installed. Information is prepared on requirements and workers are trained in how to implement and adjust protection barriers and warning devices.
|
Barriers and warning devices that protect site infrastructure from contact with mobile equipment are installed as designed. Protection types include physical barriers that prevent contact through to warning/vision enhancing devices to enhance vehicle operator’s situational awareness. Workers only remove or modify barriers in line with site requirements. |
Records of as designed, installation of barriers and warning devices. Regular inspection and test records confirm performance requirements are being maintained. |
GMMHST2012-080 Trenching – reserve topsoil and make trench safe GMMHST2012-385 Provide clearance to overhead lines and permits for power line corridor entry |
| BI-LPA.48.01 Power line working distance management process |
Safe working distances are always maintained between power lines and mobile equipment e.g. cranes, trucks, forklifts, etc. |
Procedures in place specifying minimum approach distances and required controls when working near and travelling under powerlines. Warning devices required on power lines – Tiger Tails, Signage and Power Line Corridor entry permits.
|
Supervisors and mine planners are aware of minimum approach distances to power lines from mobile plant implement expected controls e.g. use of permits in some circumstances. Supervisor, superintendents, and managers monitor the activities of vehicle operators working around powerlines and confirm meet site performance requirements. |
Task level workflow logs Permits Supervisor inspections Lift plan records |
|
| BI-LPA.57.01 Mobile equipment operators follow road rules and adjust based on conditions and circumstances. |
Mobile equipment operators follow road rules drive to conditions and circumstances. |
Mobile equipment operators follow road rules and adjust based on conditions and circumstances by:
|
Ongoing briefings and checks that confirm that mobile equipment operators understand road rules and are aware of necessary operating adjustments based on conditions and circumstances. |
Supervisor and despatch oversight. Supervisors and peers monitor vehicle operator performance. By exception hazard reporting and incident investigation. |
|
| BI-LPV.56.01 Road surface changes are identified and managed by vehicle operators |
There is a site process that details expected responses from operators when there are changes in road surfaces. |
Site specific information is available for vehicle operators to assist with identifying and managing changes in road surfaces based on vehicle type covering:
Initiating road maintenance activities (pavement and signage).
|
Training, assessment, and sign-off that vehicle operators can identify and notify changing road conditions including in excavations and dump areas. Vehicle operators notify supervisors about changes to, and hazards, present within the road network. Supervisors or Superintendents respond to the identified hazard or change. |
Hazard reports. Road maintenance records. Supervisor inspections and logs. |
|
| BI-LRA.42.02 Speed and operating environment parameter data send |
Relevant equipment operating data is used to improve the design, construction, and maintenance of the operating environment. |
Equipment operating data relevant to the design, construction, and maintenance of the operating environment is captured and transferred and may include:
Specifications for how equipment data related to the operating environment is aggregated, sorted, monitored, reported, and analysed are in place. |
On-board systems monitor equipment usage, data is transferred via site infrastructure. The data is aggregated and sorted so that it can be used for performance monitoring, reporting, and analysis. OFI-119 Confirm and apply calibration requirements for VIMS speed monitoring Workshop participants discussed how vehicle speed at Tarkwa Mine is measured using VIMS. They noted recent concerns about the system calibration and accuracy so that there is confidence that reliable information is being captured and reported. Confirm and apply the minimum requirements for calibration of vehicle measuring systems. |
Accurate, timely, and tailored reports on operating environment impacts on equipment are provided to operators, supervisors, mine planners, maintenance personnel, training, and management. Reports are reviewed and performance drifts are identified and corrected. OFI-135 Review speed limit communication and enforcement. Workshop participants discussed incidents cause by speeding at Tarkwa including vehicle roll overs and slides. They also consider situations where vehicles travelling too slowly have caused traffic issues on both access and haul roads. Slow moving vehicles generate driver frustration and potential for higher risk driving manoeuvres. Speeding above limits increase the likelihood of vehicles losing control. Review site processes for communicating, monitoring and reinforcing the requirements to travel at zoned speeds and adjust for conditions and circumstances. |
|
| BI-LTA.56 Formal processes for managing changes in conditions |
There are formal processes in place for managing changes in conditions that can compromise safe production. |
Procedures in place for managing changes to normal mobile equipment operations covering:
Also conditions which compromise normal road traffic operations such as:
Consider developing Trigger Action Response Plans for site relevant changes in conditions. Use gradated levels with required responses such as:
|
Supervisors and workers are trained in developed TARPs and their competence is confirmed. Conditions beyond those expected trigger an appropriate response from sites escalating awareness and ceasing operations as appropriate. Significant (Amber and above) triggers are communicated to more senior personnel on site. |
Training and awareness records. TARP levels and site responses are approved and in-date. Records of communications and notifications of Amber and Red levels, including with external parties as required. OFI-137 Review understanding for applying processes when there are significant changes in operating conditions or circumstances. Workshop participants confirmed that there are site processes in place for dealing with changes in operating conditions and circumstances e.g. third parties on mine site. However, they questioned knowledge and awareness levels on the application of these processes, including triggers for their implementation and key actions that follow. Review understanding and capability of operators and other in-field personnel e.g. drillers and field maintenance to notify and act on changes in operating conditions and circumstances. |
GMMHST2012-092 Inspections and response required around all loose material, filled benches or degrading of berms |
| BI-LTA.57 Ceasing Operations Procedure – compromised operating environment |
Significant compromises to the operating environment will initiate the site cease operations process and plans. |
There is a process and threshold for ceasing operations at site because of compromised operating conditions that considers:
|
Training and assessment in the process and threshold for initiating the ceasing operations process for mobile equipment operators, supervisors and managers. Summary information on the process steps and thresholds is available on Trigger Action Response Plans (TARP) or equivalent. The summary information includes site relevant operating environment thresholds and expected actions when it is no longer safe to continue normal operations using mobile equipment. |
Training records. Approved and in-date Trigger Action response Plans (TARPS) with site relevant operating environment thresholds and expected actions. Risk and control management records. |
|
| BI-LTA.58.01 Lightning and Extreme Weather Management |
There are formal processes in place for managing heavy rain, electrical storms, and other extreme weather events. |
Procedures in place for storm situations and other weather impacts on roads and mobile equipment operations. Develop and implement a process to minimise potential for fire from lightning strikes and other weather impacts
OFI-106 Consider Developing a site TARP to consistently manage Electrical Storms. Workshop participants confirmed managing Electrical Storms (lightning) at Tarkwa Mine is decided on a case by case basis. They also discussed how weather tracking radar might be used to monitor the distance to storm fronts. This approach does not deliver a consistent response to managing the hazards from electrical storms such as lightning strikes on heavy mobile equipment causing tyre bursts, premature detonation of explosives, or strikes to pedestrians in the open. Confirm the ability to track the distance of electrical storms from Tarkwa. Benchmark and adapt approaches that have been developed and deployed at other Gold Fields surface operations e.g. Trigger Action Response Plans (TARPs) that detail actions to be taken when there is an electrical storm based on distance from site. |
Training and assessment in the process and threshold for initiating the ceasing operations process for mobile equipment operators, supervisors, and managers during storms and other weather conditions impacting road network safety Summary information on the process steps and thresholds is available on Trigger Action Response Plans (TARP) or equivalent. The summary information includes site relevant weather condition thresholds and expected actions when it is no longer safe to continue normal operations using mobile equipment. |
Supervisors monitor activities of Vehicle Operators during storms – confirming their activities meet site requirements. Training records are regularly checked to confirm currency of workers understanding around storm and lightning response requirements. |
|
| BI-MDV.65.31 Clear requirements for loading and unloading of trucks by excavator or loader |
Loading, transporting and dumping (unloading) of mobile equipment with bulk materials is safe and productive. |
The loading system must be designed so that the vehicle cabin is prevented from being under a load that could exceed the maximum weight impact for the cabin or impact vehicle stability. Operational and safety requirements are specified in procedures and other documents and media e.g. instructional videos. They provide information to the operator about:
They include relevant change management thresholds such as:
OFI-100 Review site processes for managing non-standard loads. Workshop participants discussed site processes and practices for the safe movement of non-standard loads. They identified gaps in how operators are informed and the application of required controls for managing non-standard loads. Review site documentation for movement of loads and associated training modules and confirm that control advice is adequate e.g. maintaining load stability for wet bulk loads, load placement, route planning, use of escorts, the role of spotters when reversing etc. |
Engineering sign-off that the loading system and the vehicle in use meet are fit for use. Vehicle operators are trained and assessed in loading requirements, including emergency response. Supervisor oversight. |
Equipment selection records. Training records. Supervisor inspection records of loading operations. |
GMMHST2012-105 SOPs to be established for truck loading GMMHST2012-321 Engineering Manager to implement Lifting and Craneage System so loads are secured whilst in motion and during transport GMMHST2012-463 (1-7) Develop and implement specifications for selection and SOPs for operation and maintenance of Hydraulic Excavators with training and authorisation of operators and maintainers GMMHST2012-463 (8-11) Develop and implement SOPs for loading and moving operations including training and authorisation of operators, truck drivers and spotters |
| BI-MDA.65.02 Clear requirements for loading from structures e.g. reject bins |
Loading mobile equipment from fixed infrastructure is safe and productive. |
The loading system must prevent the cabin of the vehicle from entering the area under the bin, unless a Falling Object Protection System (FOPS) that exceeds the maximum weight impact, is installed over the vehicle cabin to protect the operator. Operational and safety requirements are specified in procedures and other documents and media e.g. instructional videos. They provide information to the operator about:
They include relevant change management thresholds such as:
|
Engineering sign-off that the loading system and the vehicle in use meet are fit for use. Vehicle operators are trained and assessed in loading requirements, including emergency response. Supervisor oversight. |
Equipment selection records. Training records. Supervisor inspection records of loading operations. |
|
| BI-MPA.66.11 Expected routes by vehicle type are effectively communicated |
All vehicle operators are aware of the routes that they are expected to travel on based on the vehicle type that they are operating e.g. segregated routes for light vehicles. |
There are multiple communication processes that provide expected route information to vehicle operators including:
GHG Tarkwa Traffic Management Plan, Mining Operations Procedure, TGM 1.10.54 WI as approved for use 01-03-07 6.1.6. Traffic Signage Road signs are located on all roads throughout the site. They shall be obeyed at all times and apply to light and heavy vehicle drivers. Sufficient warning signs need to indicate potential dangers. Signs shall be kept clean and well-maintained so that they are always visible. No vehicle is to proceed beyond a no-entry sign or barricade unless the specific authorization of a supervisor has been obtained. |
Ongoing briefings and checks that vehicle operators understand the road network and how they are expected to operate i.e. where they are and the direction that are to travel. OFI-149 Review the holding and availability of no-entry signage. Workshop participants discussed and identified situations where the unavailability of no-entry or restricted access signs have resulted in mobile equipment entering areas with compromised conditions, causing unnecessary vehicle interactions. The limited supply of signage is reported as being frequent. Review the site processes for holding and efficiently deploying no-entry and restricted access signs. Confirm that there are enough signs available in accessible locations for use as required. |
Supervisor and despatch oversight. Supervisors and peers monitor vehicle operator performance. By exception hazard reporting and incident investigation. |
|
| BI-SDA.95.50 Consultation and Engagement with Regulators and Third Parties | Site status and requirements are shared with the Regulator and other stakeholders. |
Site requirements for
consultation and engagement include:
|
|
|
| Name | BI Expectation | Specify | Implement | Monitor | Related Ghanaian Statute |
|---|---|---|---|---|---|
| BI-MRA.71.03 Selecting and Deploying Proximity Detection Systems and other Technologies |
Proximity Detection Systems meet site functional, performance, and technical requirements and deliver capable solution outcomes. |
Proximity Detection Systems are selected to deliver site relevant Capable Solution Use Case
The Capable Solution Use Case has these elements: Technology Functional Requirements – these define what new technology Vehicle Interaction Controls can and do not do.
Technology Performance Requirements – site performance requirements are determined by site personnel considering the site personnel considering the consequences of operating without the new technology control in place.
Site Technical and Infrastructure Requirements – where relevant, these cover technical requirements to support the deployment, installation, and operational integration of new controls e.g. extensions of site WiFi networks, installation of private 5G networks. Include questions on technical and infrastructure requirements in Request for Proposal (RFP). Prepare a site functional, performance and technical specification for use when issuing a Request for Proposal (RFP), assessing, and selecting VI Collision Control technology options offered by Original Equipment Manufacturers (OEMs) and Third-party technology suppliers. |
Applying User Requirements to assess and select technology to:
Pilot work with technology option personnel and experienced site personnel to:
Based on the pilot results, make a go- or no-go decision on operational deployment. OFI-139 Confirm and Communicate Plan and Timelines for CAS installation At the time of the November 2024 Vehicle Interaction Control Effectiveness (VICE) review, only part of the mobile equipment fleet at Tarkwa mine was operating with collision avoidance systems (CAS) installed. Mobile equipment operating without an installed CAS system installed is invisible. Workshop participants support the further installation of CAS systems and consider that light vehicles are a priority category. Communicate details on project priorities, timelines for installation, and management commitment to further improve vehicle interaction controls at Tarkwa Mine. OFI-127 Identify and link VICE workshop outputs relevant to the CAS Project Workshop participants highlighted the importance of getting the collision avoidance system in place and operating at Tarkwa. Lack of complete coverage of CAS leads vehicles not being
readily visible in operations and there are many failure modes. Many of these
can be addressed by having test stations installed at all go lines. Workshop participants support the CAS project and support linking their issues and opportunities for improvement captured in the VICE workshop to the project. |
When implementing vehicle interaction control improvement technology projects consider:
OFI-130 Leverage technology to improve vehicle interaction monitoring by category and location. As with every other large mining operation, there are thousands of vehicle interactions each day at Tarkwa mine. Without leveraging technology, analysing interaction patterns at scale is not possible. Current approaches to assess and monitor performance are based on observations by individuals. Explore if CAS technology, or technology combinations such as CAS and Dispatch can be used to identify different subsets of vehicle interactions e.g. heavy vehicle to light vehicle, pedestrian interactions, service truck, maintainer vehicles to operations equipment etc. If it can, consider the value of developing performance measures for different categories of vehicle interaction. Include location in the analysis. |
|
| BI-LDV.43 Road design guidelines specify minimum parking area requirements |
Parking area designs are fit for purpose. Parking areas are constructed and maintained to meet site requirements. |
Parking area designs and construction include layouts for crib areas that segregate vehicle types and provide walkways at safe locations. GHG Tarkwa Traffic Management Plan, Mining Operations Procedure, TGM 1.10.54 WI as approved for use 01-03-07 provides comprehensive details in site parking requirements in Section 6.3.7. Parking. This covers:
OFI-141 Review, update, and apply the Tarkwa Traffic Management Plan GHG Tarkwa Traffic Management Plan, Mining Operations Procedure, TGM 1.10.54 WI was first approved for use on the 01-03-07. It is still current but has not been reviewed and updated since initial publication. It is a comprehensive document that confirms a range of site design and operating requirements that reflect good mine design and operating practice at Tarkwa. However, during the Tarkwa 2024 Vehicle Interaction Control Effectiveness (VICE) review, workshop participants identified misalignments between this key reference document and operational practice and conditions. These include:
These issues were confirmed by supporting consultants during mine tours and interviews. Consider a review of the Tarkwa Traffic Management plan in conjunction with the development of Gold Fields Minimum Standards for Vehicle interaction controls. At a minimum the review should revisit and update minimum requirements for:
|
Designs are executed by road construction crews – placing windrows and berms as required to segregate vehicle types and walkways. Supervisors direct and monitor the activities of road maintenance and construction crews. OFI-153 Review in pit parking planning and practices. Workshop participants advised that restrictions in mine working areas leads to narrow access roads, confined work areas, frequent interactions between workgroups, poor siting of light vehicle parking areas, and sometimes an absence of parking. Poorly parked mobile equipment creates vehicle interaction hazards e.g. when heavy mobile equipment departs from a parked position. Confirm that parking area planning and design processes are adequate and monitor in pit parking practices. |
Commissioning and handover records confirming that ‘as built’ meets design requirements Supervisor inspection records. |
|
| BI-MDA.67.01 Protocols for working on equipment in production areas |
Personnel undertaking inspection, servicing, maintenance or recovery work on equipment in operational areas are protected from mobile equipment and other workplace hazards. |
Sites have a consistent, defined, and measurable process for managing mobile equipment and other hazards in production areas during:
The process defines:
|
Trades, service and other personnel meet site requirements for working on equipment in production areas – with placement of windrows, barriers, cones, warning signage, geo fences and other measures implemented. Designated and segregated in-pit work areas. Communication protocols with mine controller and supervisor. OFI-155 Review processes for managing equipment breakdowns and field repairs. Workshop participants advise that broken down equipment in the operating environment is often not secured and protected. Also significant in-pit repairs are carried out at Tarkwa by the Business Partners. Broken down equipment parked on, or being repair beside, hauls roads creates vehicle interaction hazards. There are a range of well established controls that include communication, demarcation, and longer term protection using earth bunds etc. Review, update and train personnel in understanding how to apply site standards to manage broken down equipment. Confirm that supervisors monitor that controls are in place and make corrections when required. |
Planning documentation. Operational logs for service and maintenance personnel. Authorisation records for personnel who carry out servicing and maintenance tasks in operational areas. Notification records. Maintenance, production supervisors, and mobile equipment operators monitor performance. Maintenance and production supervisors monitor trades and service personnel to confirm performance. |
|
| BI-MDA.72.11 Escort Requirements |
Vehicles and operators that are not approved for unrestricted site access, are escorted. Site escort requirements are clear and deliver safe and productive outcomes. |
Sites have a consistent, defined, and measurable escort process for managing access when:
The escort process defines:
OFI-105 Review site escort training and approval processes. At Tarkwa Mine, site engineering procedures confirm requirements for providing escorts in operating areas. Workshop participants discussed training for personnel who drive the light vehicles that provide escorts covering radio communications, route planning, speed, load management etc. They recognised that current site practices could lead to situations where less experienced personnel with inadequate site knowledge were used to provide escorts. Consider the benefits of formal training and approval processes for site escorts, based on site procedures. |
The site escort process is applied, and vehicle operators being escorted are briefed on:
Personnel who provide the escort are authorised and competent, and confirm that escorted vehicles are operated and parked in accordance with site requirements. Required site documents are completed. OFI-164 Review site planning for escorts Tarkwa Mine has established escort requirements for explosive trucks and non-site equipment such as mobile cranes. Workshop participants discussed requirements and identified situations where site escort processes have not been applied i.e. a driver unfamiliar with site traffic requirements was operating on site. Review site work planning and logistics control processes, confirm they include a step that identifies when escort is required with timely notification to operations so that escorts are available at the required time. OFI-160 Review escort process consider qualifications and authorisation. Workshop participants advised that there are occasions where external parties provide escorts to site locations. Escorts provided by external parties introduce training and experience issues. The practice can also lead to situations where an external escort is unaware of updated or temporary site traffic requirements and situations. Review site minimum standards for escort qualifications and authorisation. Include site communication requirements e.g. radio channels, use of CAS, informing operations etc. |
Escort documentation. Authorisation records for personnel approved to act as escorts. Escort notification records. Supervisors and mobile equipment operators monitor performance of escorts and escorted vehicles. |
|
| BI-MDV.63.01 Established requirements for approaching parked mobile equipment in operational areas |
Personnel approaching a vehicle parked in operational areas are protected from unexpected vehicle movements. |
Sites set minimum requirements for approaching and accessing parked mobile equipment, these consider the:
|
Training and assessment in requirements for accessing parked vehicles for:
Requirements are reinforced in site and area inductions. |
Training and assessment records. Induction records. Supervisors and mobile equipment operators monitor performance. Reports from CAS Systems |
|
| BI-MDV.63.05 Established requirements for parking and resting in vehicles |
First movement from parking is consistent and well controlled and avoid vehicle interaction incidents. |
Where permitted on site, there is a documented requirement for vehicle operators to park in an authorised location, isolate the vehicle prior to resting and complete an around vehicle inspection before moving off. |
Where resting in vehicles is permitted on site, there is a documented and communicated process that confirms requirements covering
|
|
GMMHST2012-557 Sleeping in the mine is prohibited |
| BI-MDV.64.01 Road design guidelines specify walkway designs considering vehicle sight lines |
Walkways are designed, constructed, and maintained to site standards. |
Walkway design and construction follows site design requirements for protecting walkways near vehicle travel paths. These may include using:
Vehicle sightlines and other features such as lighting and proximity alarms are considered when designing and constructing walkways. OFI-141 Review, update, and apply the Tarkwa Traffic Management Plan GHG Tarkwa Traffic Management Plan, Mining Operations Procedure, TGM 1.10.54 WI was first approved for use on the 01-03-07. It is still current but has not been reviewed and updated since initial publication. It is a comprehensive document that confirms a range of site design and operating requirements that reflect good mine design and operating practice at Tarkwa. However, during the Tarkwa 2024 Vehicle Interaction Control Effectiveness (VICE) review, workshop participants identified misalignments between this key reference document and operational practice and conditions. These include:
These issues were confirmed by supporting consultants during mine tours and interviews. Consider a review of the Tarkwa Traffic Management plan in conjunction with the development of Gold Fields Minimum Standards for Vehicle interaction controls. At a minimum the review should revisit and update minimum requirements for:
OFI-126 Develop a walkway design standard and include in mine design guidelines. The workshop participants were not aware of any formal specifications around pedestrian walkway designs and construction e.g. for go lines, around workshops. This lack of a site design specification means that there is no consistency in how walkways are created and maintained on site. Benchmark good practice at Gold Fields. Develop a Tarkwa mine walkway standard on the site design guidelines. |
Walkways are constructed and maintained to meet site requirements. Site design requirements are referenced before any walkway modifications are made e.g. new mobile equipment, facility use change etc. |
Walkway commissioning and handover records confirming that ‘as built’ meets design requirements Housekeeping and facilities inspection records. Maintenance records. |
|
| BI-MDV.66.05 Positive communication protocol for passing or moving close to a vehicle |
Passing of vehicles in operational areas is clear, applied and requires vehicle identification and positive communications. |
There are site standards, processes, procedures, and work instructions, that detail communications requirements when passing vehicles. At a minimum these cover:
|
Training and Assessment in requirements for Positive Communications for passing a vehicle are included and reinforced in multiple training and awareness modules e.g. operator training and area inductions. Requirements are routinely reinforced and communicated at shift briefings covering:
Gold Fields Ghana-Tarkwa Mine Light Vehicle Driver Presentation – Slide 30 – Always ensure there is some contact between you and the person driving the vehicle you want to overtake… OFI-152 Review the design and application of positive communication processes at site Workshop participants discussed the application of positive communication processes to identify vehicles and confirm permissions when entering active haul circuits, work areas, and when passing. Consultant Comment: workshop participants comprehensively reviewed the industry good practice references and made comparisons with Tarkwa mining practices and circumstances. Notable discussion points and differences include:
Safe and productive mining operations are delivered when personnel operating vehicles remain alert and situationally aware and there is a coordinated and consistent approach to manage interactions. Surface mining operations typically deliver these outcomes using a combination of approaches that include a disciplined positive communications approach. Review Tarkwa site standards, expectations, and practices for positive communication to manage vehicle interactions. Consider benchmarking with other Gold Fields surface operations to confirm minimum standards. Involve Business Partners in the review. Consultant Comment – Positive communication protocols and requirements normally are more formal giving an example like “Light Vehicle 45 to Haul Truck 22 can I pass on your right hand side –> Haul Truck 22 to Light Vehicle 45 – yes, you are Ok to pass –> Light Vehicle 45 to Haul Truck 22 thank you I have now passed and am out of your area” |
Training system records confirm currency of skills. Supervisors and peers monitor vehicle operator radio calls and actions. Training records confirm the currency of vehicle operator understanding of communication requirements. Specified review period to retain competencies are stated and tracked. |
|
| BI-MPA.62 Handover process between work crews |
There is a formal handover process between work crews that records and communicates operational status. |
There is a formal handover process between work crews that records and communicates:
|
At the beginning of the work period, supervisors brief their work crews on relevant items. At the end of the work period, a log is prepared for the next work crew. |
Communications logs are completed and available for the next work crew. Prework briefings are delivered. |
|
| BI-MPV.61.01 Vehicle interactions are considered during short-term planning processes |
Mobile equipment interactions and operating requirements are always considered when approving, planning, and scheduling work. |
Short term planning processes consider interactions between workgroups and mobile equipment operating requirements when approving, planning, and scheduling work.
|
Technical planners and operational superintendents review skills of available operators and vehicle/work group interactions during planning. Supervisors issue instructions based on short term plans. |
Performance is monitored referencing instructions from short term plans e.g. through supervisor inspections. Adjustments are made when required. |
|
| BI-MPV.64.01 Pedestrian working in operational area communication and operating protocols |
There is an effective and applied communication protocol for managing interactions between pedestrians and mobile equipment. |
Sites have consistent, defined, and measurable processes for managing interactions between pedestrians and mobile equipment. These define communication requirements based on the situation including:
They also confirm what communication equipment and signage is required for different situations on site, for example
|
Training and assessment in requirements for working in operational areas as a pedestrian. Requirements are reinforced in area inductions and periodically at start of shift or similar briefings. Planners and supervisors identify workgroup interactions and confirm required communication before entry and during work. Permanent or mobile signs provide call up information OFI-151 Review site processes and confirm that they are adequate to support required radio communications. Workshop participants discussed site processes and schedules for the routine checking of radios in mobile equipment. This includes prestart checks, defect reporting, and scheduled maintenance of radios and site infrastructure. It also incudes confirming minimum requirements for radios in heavy mobile equipment, service vehicles, light vehicles and for pedestrians. Surface mining operations typically deliver safe and productive outcomes using radios to support disciplined positive communications to manage interactions in working areas. Workshop participants report that radio faults do occur and that pre start and routine schedules for checking radios and communication infrastructure are inconsistent. Review site processes and confirm that they are adequate to support required radio communications. Involve Business Partners in the review. |
Training records confirm that relevant personnel are competent e.g. maintainers, service personnel operators, supervisors. Supervisors monitor performance. Records of start of shift or similar awareness briefings. Collision avoidance system logs and reports on equipment and pedestrian interfaces. By exception hazard and incident reporting. |
|
| BI-MPV.64.02 Around vehicle inspection or use of spotters to identify hazards before moving |
There are no unplanned vehicle to person or vehicle to vehicle contacts on first movement. |
Before moving off from being parked or driving into locations with limited clearance, vehicle operators carry out an around vehicle inspection e.g. a HV walk around inspection. If required by site, horns are used to indicate vehicle operation e.g. once prior to starting the vehicle, twice before forward movement, three times before reversing. Where movement in constrained locations is required, a spotter is requested by the operator and nominated by a supervisor. |
Training and assessment in requirements for vehicle operators to conduct an around vehicle inspection prior to first movement after parking. Use of spotters and vision aids as required to manage operation in locations with restricted clearance. |
Supervisors monitor vehicle operator prestart check including around vehicle inspection. Area cameras provide records of vehicle operation that are regularly reviewed. |
|
| BI-MPV.64.03 Protocols for approaching and accessing heavy mobile equipment |
Approaching and accessing mobile equipment follows a consistent, defined, and measurable process. |
Sites have consistent, defined, and measurable process for approaching and accessing mobile equipment. The process covers pedestrians and light vehicles approaching:
|
Training and assessment in positive communications and the process for accessing a heavy vehicle are included and reinforced in multiple training and awareness modules e.g. operator training and area inductions. The site requirements for managing interactions between:
are routinely reinforced and communicated at shift briefings. |
Training records confirm that relevant personnel are competent e.g. maintainers, service personnel operators, supervisors. Supervisors monitor performance. Collision avoidance system logs, reports, and heatmaps. By exception hazard and incident reporting. |
|
| BI-MPV.65.02 Road demarcation for changing conditions, commissioning, and live testing |
There are effective road demarcation processes in place that manage hazards and interactions between workgroups. |
There are site standards, processes, procedures, work instructions, that detail road demarcation and hazard communication requirements for:
|
Road demarcation, hazard warning and management requirements are included and reinforced in multiple training and awareness modules e.g. operator training and area inductions. Requirements are routinely reinforced and communicated at shift briefings covering:
Breakdowns and other events which interrupt or change a travel way are notified to other road users and appropriate demarcation and warnings are put into place. Supervisors monitor and update status for shift handover. |
Pre work hazard assessments for field crews working on equipment. Supervisor inspection records. |
|
| BI-MPV.65.11 Same direction travelling and queuing separation protocols |
Nil vehicle to vehicle contacts during travelling and queuing operations. |
Site requirements for separation between vehicles when travelling in the same direction, and when queuing, are clearly stated.
|
Vehicle operators are trained and assessed on their understanding of required separation distances – including challenge testing and observation to confirm they are alert to road network features which provide additional guidance on how far they are from the vehicle in front. |
Training records confirm the currency of vehicle operator understanding of separation distances. Specified review period to retain competencies are stated and tracked. Supervisors monitor vehicle operator performance. Proximity detector logging and exception reporting. |
|
| BI-MPV.65.12 Vehicle entering a work area positive communications protocol |
All personnel operating vehicles remain alert and situationally aware when working in congested areas. |
There are site standards, processes, procedures, and work instructions, that detail vehicle entry requirements to congested work areas e.g. when loading and dumping, or when accessing workshop areas At a minimum, these detail:
|
Training and Assessment in requirements for Positive Communications for Entering a Work Area requirements are included and reinforced in multiple training and awareness modules e.g. operator training and area inductions. Requirements are routinely reinforced and communicated at shift briefings covering:
Permanent or mobile signs are provided with call up requirements. OFI-152 Review the design and application of positive communication processes at site Workshop participants discussed the application of positive communication processes to identify vehicles and confirm permissions when entering active haul circuits, work areas, and when passing. Consultant Comment: workshop participants comprehensively reviewed the industry good practice references and made comparisons with Tarkwa mining practices and circumstances. Notable discussion points and differences include:
Safe and productive mining operations are delivered when personnel operating vehicles remain alert and situationally aware and there is a coordinated and consistent approach to manage interactions. Surface mining operations typically deliver these outcomes using a combination of approaches that include a disciplined positive communications approach. Review Tarkwa site standards, expectations, and practices for positive communication to manage vehicle interactions. Consider benchmarking with other Gold Fields surface operations to confirm minimum standards. Involve Business Partners in the review. |
|
|
| BI-MPV.66.01 Road design guidelines specify minimum requirements for delineation |
The design and installation of delineators assists mobile equipment operators to accurately estimate separation distances. |
Road designs and construction requirements include standards for the accurate spacing of delineators along the road network. Spacing guideposts are placed at distances relative to the distance required to be maintained between mobile vehicles. Site design requirements specific the use of reflector colours e.g. Use red reflectors on the left, white on the right. OFI-141 Review, update, and apply the Tarkwa Traffic Management Plan GHG Tarkwa Traffic Management Plan, Mining Operations Procedure, TGM 1.10.54 WI was first approved for use on the 01-03-07. It is still current but has not been reviewed and updated since initial publication. It is a comprehensive document that confirms a range of site design and operating requirements that reflect good mine design and operating practice at Tarkwa. However, during the Tarkwa 2024 Vehicle Interaction Control Effectiveness (VICE) review, workshop participants identified misalignments between this key reference document and operational practice and conditions. These include:
These issues were confirmed by supporting consultants during mine tours and interviews. Consider a review of the Tarkwa Traffic Management plan in conjunction with the development of Gold Fields Minimum Standards for Vehicle interaction controls. At a minimum the review should revisit and update minimum requirements for:
|
Road construction crews place and maintain delineators at required distances. |
Commissioning and handover records confirming that ‘as built’ meets design requirements Supervisor inspection records. |
|
| BI-MPV.68 Refuelling Practices |
Refuelling of mobile equipment is productive and safe. |
Operating sites have refuelling procedures that confirm requirements for:
|
Training and assessment for personnel responsible for refuelling. Training and assessment for mobile equipment operators. Site refuelling infrastructure and equipment meets site standards. |
Housekeeping Inspections. Training system currency of refueller skills. Audits of site refuelling infrastructure and equipment. Approved and in-date emergency response plans and periodic exercises. OFI-154 Review refuelling practices and processes on site Workshop participants identified situations where mobile equipment refuelling is not happening at designated locations, spotters are not used, and communication between operators and service personnel is inadequate. Unexpected and unintended movement of vehicles during refuelling has resulted in incidents at site and across the mining industry including fires, and vehicle collisions. Review site refuelling requirements and confirm that they are being applied to deliver safe and effective refuelling operations. |
GMMHST2012-295 Live testing and lubrication to be engineered and controlled to prevent injury |
| BI-MRA.71.05 Proximity detection system data send |
Installed proximity detection systems are fully leveraged to assist equipment operators, pedestrians, supervisors, and site management improve operational performance. |
Installed proximity detection systems are fully leveraged to assist equipment operators, pedestrians, supervisors, and site management improve operational performance. |
When proximity detection systems are fitted, data is from vehicles, pedestrians, and infrastructure is sent to:
Data and associated information are managed following site privacy and record keeping standard. Reports and analysis may include:
OFI-114 Improve implementation of consistent fleet ID across site systems. The Tarkwa VICE review confirmed that fleet identification for vehicle types is not always available and may be inconsistent. Without adequate knowledge of vehicle types then unwanted proximity alarms may be generated. Further define the issues and work with the technology provider to resolve how fleet IDs are loaded and tracked inside and across multiple systems. Establish agreed points of truth and checks. |
Reports confirm proximity data is being captured, transmitted, aggregated, analysed and applied improve vehicle interaction performance for:
Confirmation that site privacy management standards are being maintained e.g. through audits or reviews. Performance metrics e.g. operator score cards, supervisor interactions, construction and maintenance of the operating environment meets design standards. OFI-130 Leverage technology to improve vehicle interaction monitoring by category and location. As with every other large mining operation, there are thousands of vehicle interactions each day at Tarkwa mine. Without leveraging technology, analysing interaction patterns at scale is not possible. Current approaches to assess and monitor performance are based on observations by individuals. Explore if CAS technology, or technology combinations such as CAS and Dispatch can be used to identify different subsets of vehicle interactions e.g. heavy vehicle to light vehicle, pedestrian interactions, service truck, maintainer vehicles to operations equipment etc. If it can, consider the value of developing performance measures for different categories of vehicle interaction. Include location in the analysis. OFI-115 Improve quality of data networks on site. Workshop participants noted that there are frequent disconnects due to poor signal and network challenges around the Tarkwa operations. With loss of signal the ability for dispatch to contact and advise operators of responses to alarm states is impaired. Improve quality and reliability of site data networks to support timely and reliable alarm responses. |
|
| BI-MRA.72.01 Controlled Access to Operational Areas |
Site access infrastructure controls are in place and permissions to enter operational areas are clear, applied, and well managed. |
There are site standards, processes, procedures, work instructions, and specification to manage site and area access for personnel (including third parties), animals, and mobile equipment. These cover:
GHG Tarkwa Traffic Management Plan, Mining Operations Procedure, TGM 1.10.54 WI as approved for use 01-03-07 6.1.4. Pedestrian Segregation The greatest risk to pedestrians is from vehicles and mobile equipment. Pedestrian activity within the operational areas shall be restricted wherever possible, particularly in hours of darkness. For certain operations, “no entry” zones shall be identified and clearly marked by signs, fencing, cones, etc. Employees shall not enter active operational areas as pedestrians unless authorized to do so. Where practicable, pedestrian routes or zones shall be established and designated with suitable signs, barriers, road markings, etc., particularly where equipment is operating or maneuvering. Such areas would be equipment and vehicle parking areas, around static equipment and buildings, particularly workshops. 6.1.4.1. Segregation between Heavy Equipment and Light Vehicles Segregation shall be observed at the following locations:
OFI-134 Consider mandating fitted radios for all mine vehicles. Workshop participants discussed situations
where vehicles are routinely entering the mine without functioning radios.
Many personnel operating light vehicles in the pit use hand held
radios. Inability to contact other vehicles, or
be contacted, can lead to misunderstandings and cause vehicle
collisions. Confirm the site equipment specifications requirements for fitted and functioning radios. Communicate site requirements and consider having radio checks when buggy whips are fitted to light vehicles. Reduce the reliance on portable radios e.g. to pedestrians and escorts. Consider mandating fitted radios on all mine vehicles. |
OFI-158 Review work area access processes. Workshop participants discussed and identified situations when operational area access controls have not been applied. This includes missing signs and failures to communicate. This has resulted in incidents where unexpected vehicles enter working areas. Review site processes for controlling access to operational areas including work area inspections that confirm signs are in place. |
|
GMMHST2012-042 Lawful orders from Inspectors must be followed GMMHST2012-062 Beacons to mark boundaries should not be constructed at night GMMHST2012-063 Temporary Beacons or signage can be used to mark lease boundaries GMMHST2012-064 Beacons to be sturdy and durable GMMHST2012-065 Beacons and boundary marks to be maintained GMMHST2012-066 Additional beacons and clearing of boundary lines at lease holders cost when requested GMMHST2012-080 Trenching – reserve topsoil and make trench safe GMMHST2012-085 All access ways to be safe GMMHST2012-090 Plan for safety and protection of workers from slopes with Berms, scaling, working to avoid falls from or onto, constructing smooth walls, and manage other threats GMMHST2012-112 No access to stockpiles being filled from above without isolating feed source and applying safe working at height measures GMMHST2012-294 Only authorised people to enter site, operate, or maintain machinery GMMHST2012-385 Provide clearance to overhead lines and permits for power line corridor entry |
| BI-MTV.65.01 Ceasing Operations Procedure – significant interaction threats |
Significant interaction threats will initiate the site cease operations process and plans. |
There is a process and threshold for ceasing mobile equipment operations at site because of significant interaction threats caused by:
|
Significant interaction threat awareness, training and assessment for vehicle operators, supervisors and management covering:
Real world examples are used for training, induction, and start of shift briefings. Examples include an explanation of how interaction threats develop OFI-150 Update emergency response requirements across all roles. Workshop participants discussed site emergency response processes and identified situations where personnel have not acted as expected based on emergency response process design and training. Issues discussed include continuing to operate during an emergency and entering the emergency locations. Unexpected vehicle or pedestrian movements while responding to an emergency can compromise the response. Review operator understanding of their expected actions for a range of typical site emergencies e.g. fire, tyre incident, vehicle incident, third-part on site etc. Include site response processes including ceasing operations and not entering emergency locations. Review current training and awareness materials and refresher schedules and update as required. |
Training and assessment records. Approved and in-date TARPs or equivalent. By exception post incident reviews. OFI-137 Review understanding for applying processes when there are significant changes in operating conditions or circumstances. Workshop participants confirmed that there are site processes in place for dealing with changes in operating conditions and circumstances e.g. third parties on mine site. However, they questioned knowledge and awareness levels on the application of these processes, including triggers for their implementation and key actions that follow. Review understanding and capability of operators and other in-field personnel e.g. drillers and field maintenance to notify and act on changes in operating conditions and circumstances. |
| Name | BI Expectation | Specify | Implement | Monitor | Related Ghanaian Statute |
|---|---|---|---|---|---|
| BI-CPA.09.01 Site fatigue management processes are comprehensive and optimise work rosters |
Site fatigue management processes are comprehensive and designed to support employees. |
Site fatigue management processes include:
OFI-171 Consider benchmarking Tarkwa shift rosters against other operations. Managing fatigue in mining operations is a challenge for all continuous mining operations. Effective management of fatigues requires a whole of system approach that includes the design of shift rosters. Workshop participants discussed the shift rosters deployed by Tarkwa Mine Business Partners and identified an opportunity benchmark against how other operations manage shift rosters to manage fatigue. Benchmark Tarkwa shift rosters against other Gold Fields operations, consider duration, cycle sequence, time off, number of panels etc. OFI-102 Review and formalise escalating responses for operator alertness detected by OAS. Tarkwa Mine has installed Operator Alert System (OAS) technology and has an onsite monitoring control room. The technology and supporting processes are mature and fully operationally integrated at site. Workshop participants confirmed that OAS technology is a significant vehicle interaction control in continuous mining operation. However, their discussion and review of procedures that escalating responses based on lapses in operator alertness are not in the procedure and are not included in OAS operator training materials. There is a response protocol is detailed in poster format for OAS monitoring staff and is applied routinely. The Tarkwa OAS and supporting practices set a Gold Fields benchmark. Consider reviewing and updating all supporting procedures and training modules so that they capture site practice for responding to differing levels of alertness detected in-field personnel. |
Compare industry good practice to current site approaches covering: Work Hours Policy Develop working-hours policy for daily work hours, maximum average weekly hours, total hours over a three-month period, and managing commutes and work-related travel. Managing Work Rosters
Hours of Work
Commuting and Travel
Work Demands
Shift and Night Work;
Monitor Performance
OFI-170 Review provision of resting rooms for fatigue management. Managing fatigue in mining operations is a challenge for all continuous mining operations. Effective management of fatigues requires a whole of system approach that can include providing comfortable locations for taking fatigue breaks. Workshop participants discussed Business Partner processes for taking fatigue breaks noting that there are limited options for short rests. Review the benefits of providing dedicated resting rooms for fatigued mobile equipment operators. |
Site fatigue management awareness and training is being completed to schedule. Site hours worked tracking systems send reports and identify exceedances. OFI-169: Review site processes for tracking and monitoring hours worked. Workshop participants discussed site processes for fatigue management including how cumulative hours worked, including travel time, are monitored at Tarkwa Mine. They noted that excessive hours at work without adequate breaks results in fatigued mobile equipment operators. Consider a review of the effectiveness of the current hours of work tracking system. Confirm that it considers commutes and captures information on hours worked including:
|
GMMHST2012-510 Hours of work capped at 8 hrs per day and 40 (UG) or 45 (Surface) hours per week |
| BI-CRA.09.22 Fatigue status data send |
Installed fatigue monitoring technology is fully leveraged to assist equipment operators, supervisors, and site management improve operational performance. |
When fatigue monitoring systems are fitted, they capture and send data for monitoring and analysis. |
When fatigue monitoring systems are fitted, data is sent to:
Data and associated information are managed following site privacy and record keeping standards. OFI-114 Improve implementation of consistent fleet ID across site systems. The Tarkwa VICE review confirmed that fleet identification for vehicle types is not always available and may be inconsistent. Without adequate knowledge of vehicle types then unwanted proximity alarms may be generated. Further define the issues and work with the technology provider to resolve how fleet IDs are loaded and tracked inside and across multiple systems. Establish agreed points of truth and checks. OFI-115 Improve quality of data networks on site. Workshop participants noted that there are frequent disconnects due to poor signal and network challenges around the Tarkwa operations. With loss of signal the ability for dispatch to contact and advise operators of responses to alarm states is impaired. Improve quality and reliability of site data networks to support timely and reliable alarm responses. |
Records that confirm fatigue status data is used to improve fatigue management performance for:
Confirmation that site records and privacy management standards are being maintained e.g. through audits or reviews. |
|
| BI-EPV.26.01 Skilled and experienced personnel specify and select mobile equipment and mobile equipment components. |
Suitably qualified and experienced personnel, with operating site knowledge, specify and select fit for purpose mobile equipment and related components (e.g. tyres, trailers, and attachments). |
The process for preparing equipment and component specifications considers relevant company and site standards for:
The process for selecting equipment and component considers where the vehicle will be operated:
The process for selecting equipment and component considers how the vehicle will be operated:
The selection process also considers supplier relationships and ongoing site support.
|
Suitably qualified and experienced personnel, with operating site knowledge:
|
Deployed mobile equipment and associated components deliver required production outcomes at the expected cost e.g. equipment maintenance and service schedules meet plan. Consider equipment performance measures e.g. availability, planned versus breakdown maintenance, mean time to failure etc. |
GMMHST2012-085 All access ways to be safe GMMHST2012-465 (1-4f) Vehicles to meet site specifications for safety, cabin integrity, and identified (decals). Operators to be trained and authorised to operate, move and monitor vehicles on site |
| BI-EPV.30.01 Skilled and experienced personnel are accountable for setting mobile equipment operating parameters. |
Skilled and experienced personnel consider equipment design and site requirements when setting operating parameters for mobile equipment in use. |
Accountable personnel setting mobile equipment operating parameters consider: Operating conditions: Type of surface; Condition of surface; Road gradient; Road camber or profile; Turn radii; Quarry or underground; Type and condition of dumping and loading areas; Climate and season (and associated road watering and maintenance requirements); Operator constraints and requirements Routine operations: Average and maximum speeds; Maximum wheel load; Average load; TKPH; Weight distribution – load stability and security; Cycle length – empty and laden; Shift duration; Number of cycles per shift; Mix and numbers of vehicles to deploy (as for short-term planning) Periodic duty: Towing capacity; Loading and tipping non routine loads – clay, water-logging, reactive etc.
|
The accountability for setting and reviewing site mobile equipment operating parameters is assigned to organisational roles with the appropriate knowledge, capability, and experience of site operational requirements. |
Confirm that the accountability for setting operating parameters for mobile equipment in use has been assigned. Review mobile equipment reliability and production outcomes. Confirm that equipment is operating withing site operating parameters e.g. haul distances, speed etc. |
|
| BI-SDA.85 Effective contractor selection and management processes |
Nominated personnel assist contractors, and other service providers, to deliver site business and operational objectives, efficiently and effectively. |
Contractors are selected based on their ability to provide required services and their alignment with company business, environmental, community, and health and safety values and management systems. Nominated personnel assist contractors, and other service providers, to deliver site business and operational objectives, efficiently and effectively. At contract commencement nominated site personnel provide information on site requirements including:
After project commencement, there is an agreed meeting or series of meeting to review performance, consult and resolve issues. HSMP 5.4 PR–CONTRACTOR MANAGEMENT comprehensively details site contractor management processes. |
Site contract managers regularly meet with contractors and other service providers and review:
|
Contractor performance review meeting records. Records that contractor issues are documented and resolved e.g. hazard management. Observations and audit findings e.g. contractor equipment matches site minimum standards. Feedback from contractors. |
|
| BI-SDA.89 Emergency Preparedness |
There should be a formal approach to emergency preparedness on site. It should include local response, emergency response through to crisis management. |
There should be a formal approach to emergency preparedness on site. It should include local response, emergency response through to crisis management and may include formal liaison with external agencies. Specific response plans for foreseeable site emergencies e.g. traumatic injuries, entrapment, rescue from heights, fires, spills etc. are:
At a minimum, site emergency response capability requires that:
|
A senior site position is accountable for site emergency and crisis management response and recovery capability. Emergency response plans have a review cycle and are also reviewed after incidents. Emergency response information is available in the workplace in a format that is audience appropriate. Visitor inductions include emergency notification and evacuation requirements. Employees (direct and indirect) are trained in:
Emergency responders:
OFI-150 Update emergency response requirements across all roles. Workshop participants discussed site emergency response processes and identified situations where personnel have not acted as expected based on emergency response process design and training. Issues discussed include continuing to operate during an emergency and entering the emergency locations. Unexpected vehicle or pedestrian movements while responding to an emergency can compromise the response. Review operator understanding of their expected actions for a range of typical site emergencies e.g. fire, tyre incident, vehicle incident, third-part on site etc. Include site response processes including ceasing operations and not entering emergency locations. Review current training and awareness materials and refresher schedules and update as required. |
Capability reports for Emergency Responders, Employees, and Visitors. Reviews of emergency response drills. Maintenance reports on the status of site emergency response equipment. By exception incident reviews. |
GMMHST2012-011 Site to prepare an Emergency Preparedness and Repsonse Plan GMMHST2012-026 (1-4) Serious accidents, incidents and fatalities to be reported ASAP to the Chief Inspector other incidents to be reported to the nearest Inspector GMMHST2012-531 – Provide and maintain a first aid station with adequate trained personnel and equipment GMMHST2012-532 Competent persons to be appointed as first aiders and include their names in the site information management system GMMHST2012-533 Small mines to provide the room but not a permanent first aider GMMHST2012-535 Manager to provide for safe transport of injured workers to the nearest hospital GMMHST2012-537 Provide antidotes, eyewash fountains and showers near hazarous goods storage and use |
| BI-SDA.89.01 Vehicle Incident Emergency Preparedness |
The site has a formal approach for emergency preparedness that includes vehicle incidents. |
There should be a formal approach to emergency preparedness on site that includes vehicle incidents. Planning should consider multiple scenarios and locations and the corresponding capabilities for local response, site emergency response, and assistance from external agencies. Vehicle incident scenarios include:
Consider all locations taking into account potential response times, the capability of local and site emergency responders, and the availability of recovery equipment and other resources. |
A senior site position is accountable for site emergency and crisis management response and recovery capability. Emergency response plans have a review cycle and are also reviewed after incidents. Emergency response information is available in the workplace in a format that is audience appropriate. OFI-172 Review Site Capability to manage foreseeable Vehicle Related Emergencies. There is an established emergency response capability at Tarkwa mine to cover medical, fire, and other emergencies. There is also a hospital on the mining estate. Workshop participants discussed how often specific vehicle incident emergency drills were carried out covering; light vehicle roll over, entrapment, crash, rescue from HME, mobile equipment fires, etc. Confirm that site and local community emergency response planning and capability for foreseeable vehicle incidents is adequate. OFI-150 Update emergency response requirements across all roles. Workshop participants discussed site emergency response processes and identified situations where personnel have not acted as expected based on emergency response process design and training. Issues discussed include continuing to operate during an emergency and entering the emergency locations. Unexpected vehicle or pedestrian movements while responding to an emergency can compromise the response. Review operator understanding of their expected actions for a range of typical site emergencies e.g. fire, tyre incident, vehicle incident, third-part on site etc. Include site response processes including ceasing operations and not entering emergency locations. Review current training and awareness materials and refresher schedules and update as required. |
Reviews of vehicle related emergency response drills. By exception incident reviews. |
GMMHST2012-011 Site to prepare an Emergency Preparedness and Repsonse Plan GMMHST2012-535 Manager to provide for safe transport of injured workers to the nearest hospital |
| BI-SDA.91 Document and Information Management System is fit for purpose |
There is an effective document and information management system in place that meets requirements and prevents sensitive information being shared inappropriately. |
OFI-101 Resolve document reference duplicates for different GHG operations Consultant Comment: During ‘work as documented’ mapping for Tarkwa, documents for Damang were also provided. Some of these had duplicate or similar titles. If these duplicate or similar documents are accessible by decision makers at both sites then choosing the incorrect document could result in site inappropriate design or planning decisions. Review how the document information protocol applies to documents across all GHG operations. Identify situations where common standards apply and where site specific approaches apply and update document management processes. |
|
|
GMMHST2012-007 Provide contact information for Exploration and prepare an Exploration Operating Plan GMMHST2012-008 Prepare a Mining Operating Plan to receive an Operating Permit GMMHST2012-009 (1-3(d)) MOP to be submitted and detail names and mine setting GMMHST2012-023 Requirement to report on changes in ownership, leadership or mining activities to the Chief inspector GMMHST2012-024 Notify changes in statutory personnel and keep records on site of all appointed persons GMMHST2012-025 Survey prepared plans of all workings to be submitted to the Chief Inspector by the end of each calendar year GMMHST2012-027 – Report any dangerous or serious incidents that could have caused serious injury or environmental harm GMMHST2012-043 Document and Information Control required for all Regulator correspondence, certificates of proof testing (boilers, ropes, load bearing members etc.), medical records, qualification and training records, and be made available to authorised GMMHST2012-058 Accurate Survey plans of all workings, geology, buildings, and features to be prepared, controlled and submitted to the Chief Inspector GMMHST2012-059 Use SI Measurements GMMHST2012-069 Plans to be produced and submitted to the Chief Inspector (who can make copies) GMMHST2012-070 Additional Survey requested to be conducted GMMHST2012-071 Natural features to be surveyed and included on plans GMMHST2012-073 Surveyor Signed and Dated plans to be submitted GMMHST2012-074 Plans to be fully detailed and accurate GMMHST2012-075 Plans to conform with any Regulator Rules GMMHST2012-509 Employee records and photographs to be created, maintained and shared with stakeholders as appropriate |
| BI-SDV.94.01 External to site obligations for Vehicle Interaction Controls are effectively met. |
The site Traffic Management Plan (or equivalent), and associated documents, describe how relevant external to site expectations are met. |
The Traffic Management Plan (TMP) and associated documents detail how relevant external to site expectations are met for:
This information is maintained and updated as part of site document management requirements.
|
External expectations and obligations are:
If the mapping process identifies gaps and opportunities for improvement, then these are reviewed by management for relevance and possible action. |
TheTraffic Management Plan lists all relevant external requirements with details of how they are met on site. The status of the site activities mapped to external expectations are monitored and reviewed. The Traffic Management Plan is periodically updated. |
|
| BI-SPA.82.11 Comprehensive fitness for work processes |
Site requirements that all employees, contractors and visitors are fit for duty (unimpaired) while in the workplace. |
There is an effective site fitness for duty approach that:
|
Training and awareness for all personnel on site fitness for work process and their responsibilities. Associated infrastructure for amenity, hygiene, meal breaks, and rest are provided. DRUG AND ALCOHOL TESTING PROCEDURE TGM 9.29 PR V10 24/5/2023 – S6.1 and 6.2 – Trained testers using approved instruments and requirement to blow 0. S6.3 Test for cause (incident) 6.3.4 all personnel to be tested. S6.8 only tests above 0.05 are reported as a positive case. |
A comprehensive fitness for work processes is in place and being applied. Screening reports. Employee assistance reports. Training and awareness sessions completed to schedule. |
GMMHST2012-510 Hours of work capped at 8 hrs per day and 40 (UG) or 45 (Surface) hours per week GMMHST2012-516 Provide and maintain change, bath and crib rooms GMMHST2012-555 Workers to be fit for work and not consume or bring drugs or alcohol to site GMMHST2012-557 Sleeping in the mine is prohibited |
| BI-SPA.83.02 Supervisor performance requirements |
Leadership and supervisory expectations of supervisors are documented, communicated, and performance is routinely assessed. |
There is a supervisor development and appointment pathway. Reference company supervisory and leadership models are in place and available for ready reference by supervisors. Leadership Skills reinforced:
Supervisory Skills:
|
Supervisors apply their leadership and supervisory skills to deliver safe and productive outcomes. Line managers support the supervisors who report to them. Functional roles such as Human Resources and Safety assist supervisors with information and support. |
Supervisor appraisals completed to schedule. Supervisor development plans are prepared and implemented. There are records and evidence that supervisor are applying their skill e.g. completed employee appraisals, task reviews, inspections, performance management commend or correct records, daily planning, prestart meetings, review of operational logs etc. |
GMMHST2012-041 Mine Managers are resonsible for all incidents and accidents unless they have taken proper precautions GMMHST2012-044 Mine Manager to confirm duties performed by competent persons GMMHST2012-508 Supervisors to be effective communicators |
| BI-SPA.83.03 Supervisors have management and HR support when applying performance management approaches |
Competent supervisors are supported when they apply site performance management processes. |
Accountabilities are clearly defined in site performance management processes. This includes details about how managers and support personnel such as human resources or industrial relations advisors are expected to support supervisors. |
Site performance management processes are documented and current and approved by senior managers. Supervisors are trained and supported when they apply site performance management processes to:
|
Review personnel records to confirm that performance management processes are applied routinely and consistently by supervisors to:
|
GMMHST2012-035 The Appointed Mine Manager has responsibility to enforce statutory requirements GMMHST2012-044 Mine Manager to confirm duties performed by competent persons GMMHST2012-550 Workers to take care and follow site rules and procedures GMMHST2012-551 No person to cause damage to safety related equipment, signs or systems GMMHST2012-559 Not wearing required PPE is an offence |
| BI-SPA.86 Hazard and incident reporting and response processes are in place, effective, and well used. |
The site has an effective and well used hazard and incident response and reporting process which avoids placing workers at risk of injury. |
There is an effective site hazard and incident reporting processes that:
|
Personnel on site:
OFI-136 Improve Communication of Incident Learnings Tarkwa Mine has a comprehensive incident and hazard reporting process supported by the INX platform. While comprehensive information is captured and recorded in the INX platform, workshop participants discussed situations where the post incident learnings have not been communicated well to the general workforce. Review incident learnings communication format. Consider key information required by filed personnel and improve the process, if required. |
|
GMMHST2012-026 (1-4) Serious accidents, incidents and fatalities to be reported ASAP to the Chief Inspector other incidents to be reported to the nearest Inspector GMMHST2012-027 – Report any dangerous or serious incidents that could have caused serious injury or environmental harm GMMHST2012-092 Inspections and response required around all loose material, filled benches or degrading of berms GMMHST2012-531 – Provide and maintain a first aid station with adequate trained personnel and equipment GMMHST2012-532 Competent persons to be appointed as first aiders and include their names in the site information management system GMMHST2012-537 Provide antidotes, eyewash fountains and showers near hazarous goods storage and use GMMHST2012-538 First aider to treat and accompany any injured worker to further treatment |
| BI-SPA.87 Planned Inspections and Task Observations |
Planned inspections and task observations assess and provide timely feedback about the effectiveness and efficiency of performance standards (work as documented) as they are applied in the workplace (work as done). |
Planned inspections and task observations assess and provide timely feedback about the effectiveness and efficiency of performance standards (work as documented) as they are applied in the workplace (work as done). The site processes for inspections and task observations have these elements:
Task Observations provide additional information about:
Site Planned Inspections:
|
Senior site personnel confirm that scheduled inspections and task observations match schedule and quality expectations. Site Inspection and Task Observations processes are applied to:
|
Inspection and task Observation reports meet site performance expectations for quantity and quality. There is a process that manages defects, non-conformances, and other performance issues identified from inspections and task observations. These are assessed and where necessary remedial actions with due by dates are assigned. Performance reports track remedial action status. Trend analyses reports that identify drift from expected performance. OFI-108 Review and Align Mining Operations Inspection and Task Observation processes. Tarkwa Mine has a mature and well designed Planned Task Observation (PTO) process that is applied across the operation. While Task Observations on mobile equipment operations are carried out at Tarkwa, there are limits in providing timely performance feedback to the operators and collating and analyzing findings. Also, PTOs on mining operations assess both the actions of individual operators and the collected outcomes e.g. congested areas with multiple workgroups. Consider reviewing and aligning PTO, Critical Control Verification, Senior Supervisor checks, and other mining operations inspection processes. Confirm that all processes reference relevant site standards, use consistent good performance criteria, and that feedback and corrective action tracking processes are effective. Explore options to leverage technology data streams to assist the process e.g. through traffic interaction heat maps. |
GMMHST2012-107 Dump and Stockpile Management Plans to be prepared covering construction, stability, environmental controls, and processes for certifying the pile as safe GMMHST2012-110 Dump construction and Operation System includes documented designs and operating procedures to prevent slumping, edge failure, or unwanted vehicle interactions |
| BI-SPA.88 Change and Risk Management Process |
Applied and effective change management processes, incorporating comprehensive risk and control management steps, assist senior manager decision-makers to deliver safe and productive outcomes for the business. |
There is a defined change and risk management process that:
The level of effort and rigour applied to the hazard identification, risk assessment, and application of controls during change management considers situation complexity, the range of potential outcomes, and the likelihood of a loss of one or more required operating states. HSMP 5.3 PR TGM OPERATIONAL PROCEDURE MANAGEMENT OF CHANGE The scope of the procedure covers changes to new product, plant, equipment, machinery, software, staffing or process that take place on the mine including changes to existing process, products or services. Scope examples include changes to roads (construction or diversion). OFI-103 Consider including a mobile equipment change example in MoC documentation and training Consultant Comment: The Tarkwa HSMP PR 5.3 PR Management of Change document is a comprehensive document that provides a structured approach including managing stakeholder communications. It has multiple examples of the types of change that will trigger its application. However, the list of examples do not include changes to mobile equipment. Consider adding a mobile equipment as a change example. Also, check the change management document reference from HSMP 1.0 MN (the current reference is TGM 9.14 PR) |
Senior managers identify when thresholds for applying the change and risk management process are crossed such as:
Accountability for applying the process is assigned to a role e.g. project manager. The level of effort and rigour applied to the hazard identification, risk assessment, and application of controls during change management considers situation complexity, the range of potential outcomes, and the likelihood of a loss of one or more required operating states. HSMP 3.3 PR – Hazard Identification and Assessment of Risks and Opportunities details site hazard identification, risk assessment and determining controls. This document describes site processes for identifying, analysing, evaluating, managing and communicating risks and their potential safety, health and environmental impact on employees, contractors and other stakeholders. Section 3 includes accountabilities. Gold Fields Ghana apply four types of Risk Assessment:
OFI-161 Review the consistent application of site change management processes. Consultant Comment: Tarkwa mine has well documented and externally certified change management processes in place. However, workshop participants discussed situations where the process was not fully applied. Making changes without input from all stakeholders can result in suboptimal implementation and introduce new risks and hazards. Examples discussed include contractor introduction of new equipment types, and making changes to the planned activities in constrained work areas (at the lowest RLs (bottom) of the pit in particular). Review how the application of change management processes is monitored at Tarkwa. |
Reports on change and risk management activities are reviewed by maintenance planners, technical services and engineering personnel. Process change reports are reviewed by the relevant Manager. Changes are authorised by an accountable supervisor or manager who confirm that the change has been:
|
GMMHST2012-009 (1-3(d)) MOP to be submitted and detail names and mine setting GMMHST2012-010 MOP can be modified with Chief Inspector approval GMMHST2012-023 Requirement to report on changes in ownership, leadership or mining activities to the Chief inspector GMMHST2012-047 Divide the site into sections and appoint a shift boss or mine foreman to each section GMMHST2012-077 No additional tracks during construction GMMHST2012-276 Changes to Closure or Rehabilitation Plans must be submitted to Chief Inspector GMMHST2012-515 Lease holder to develop a safe work practice code to protect against operational hazards in mining, engineering, or processing |
| BI-SPA.88.01 Site change management processes apply to the introduction of new types and models of mobile equipment |
Applied and effective change management processes are in use at the operating site, and these apply to the introduction of new types and models of mobile equipment. |
The introduction of new mobile equipment components, new models and new types e.g. introduction of electric battery powered equipment follow a defined change management process that:
HSMP 5.3 PR TGM OPERATIONAL PROCEDURE MANAGEMENT OF CHANGE The scope of the procedure covers changes to new product, plant, equipment, machinery, software, staffing or process that take place on the mine including changes to existing process, products or services. OFI-103 Consider including a mobile equipment change example in MoC documentation and training Consultant Comment: The Tarkwa HSMP PR 5.3 PR Management of Change document is a comprehensive document that provides a structured approach including managing stakeholder communications. It has multiple examples of the types of change that will trigger its application. However, the list of examples do not include changes to mobile equipment. Consider adding a mobile equipment as a change example. Also, check the change management document reference from HSMP 1.0 MN (the current reference is TGM 9.14 PR) |
When senior managers confirm that change management thresholds for new equipment will be crossed, relevant parts of the process are applied to manage the introduction of the equipment e.g. for new models, different types etc. OFI-112 Apply Site Management of Change processes for new mobile equipment. Workshop participants discussed how site
change management process are used to assist with the introduction of new
types and models of mobile equipment. New equipment introduced can have insufficient other resources such as training modules considerations in mind design and availability of maintenance resources. Confirm thresholds for the application of site change management approaches for mobile equipment and monitor application of the process. |
New equipment controls are communicated and implemented. |
|
| BI-SPA.88.02 Site change management processes apply to changes in road networks and traffic flows |
Applied and effective change management processes are used when there are changes in road networks and traffic flows. |
Changes to road networks and traffic flow adjustments follow a defined change management process that:
HSMP 5.3 PR TGM OPERATIONAL PROCEDURE MANAGEMENT OF CHANGE The scope of the procedure covers changes to new product, plant, equipment, machinery, software, staffing or process that take place on the mine including changes to existing process, products or services. Scope examples include changes to roads (construction or diversion). |
When change management thresholds for modifying the road network or traffic flows are crossed, supervisors apply relevant parts of the site change management process. OFI-109 Improve management of change for road and traffic flow changes Workshop participants report that changes to the road networks and traffic flows are not always communicated to all stakeholders. Lack of vehicle operator knowledge about changes to traffic flows and road networks can lead to significant vehicle interactions. When changes to road networks and traffic flows are made, apply the stakeholder notification process detailed in site procedures. Consider developing a communication logs communications with key stakeholders such as maintenance and service personnel, Business Partners, Emergency Response, Drill and Blast, Technical department etc. |
New performance standards controls are communicated and implemented. Traffic modifications, new hazards and their controls are logged and communicated to shift crews. OFI-120 Review how changes to traffic flows and road networks are communicated to stakeholders. Workshop participants confirm that site management of change processes are applied to manage changes in road networks and traffic flows. However, communication of changes to all stakeholders is reported as being inconsistent. This has caused vehicle interaction issues. Review how communication about traffic management changes is planned and executed. Identify all stakeholders and confirm communication channels, review recent examples and apply for future changes to traffic management and road networks. |
GMMHST2012-009 (3(j-m)-4) MOP to include rehabilitation plan and schedule, and other matters required by the Chief Inspector GMMHST2012-025 Survey prepared plans of all workings to be submitted to the Chief Inspector by the end of each calendar year |
| BI-SPA.90 Effective incident reporting, and corrective action closeout. |
Incident investigation is a business improvement process for identifying and solving issues that can compromise site safety and productivity. |
Sites have formal approach for incident reporting, investigation and determining corrective actions. The approach is effective at a site level while meeting company and regulatory requirements for incident reporting, scene preservation, and management. Incident reports include what happened, loss potential, why it happened, likelihood of recurrence and provide a business case for corrective actions. |
The site incident investigation approach and supporting processes:
|
Incident management process is in place and personnel know how to apply it. Senior management records of
Assignment of approved corrective actions Progress tracking of corrective actions Periodic analysis of incident patterns including
|
GMMHST2012-026 (1-4) Serious accidents, incidents and fatalities to be reported ASAP to the Chief Inspector other incidents to be reported to the nearest Inspector GMMHST2012-026 (5-8) Site and scene of a Serious accident to be undisturbed (apart from rescue of perons or prevention of further harm) until released by the Chief Inspector or other Inspector GMMHST2012-027 – Report any dangerous or serious incidents that could have caused serious injury or environmental harm |
| BI-SPA.94 Managing Legal and Other External to Site Expectations. |
All legal expectations, company policies, standards, and other obligations are mapped to site processes. |
Sites shall ensure that general and specific external requirements are mapped directly to the Management System Framework and, as required, to other business processes so that commitments to meet external expectations are effectively delivered. Source documents (e.g. legislation, ISO Standards etc.) shall be available to all employees. GFWA ESG Contractors and Suppliers June 2023 Part 2 – point 3 confirms requirement for contractor and their subcontractors to comply with approved codes, relevant health and safety legislation, industry standards etc. Part 2 – points 4 and 5 confirm requirements for meeting site standards and applying site approved processes including GFG standards, |
Legal and other requirements shall be communicated appropriately to direct and indirect employees and inform operational work processes. Sites shall implement and maintain a process that systematically identifies, registers, updates, and assigns both general and specific external requirements, including contractual and legal, to organisational positions. Information and plans as required are generated, transmitted to external parties, and kept secure and private. HSMP 3.4 – PR LEGAL AND OTHER REQUIREMENTS PURPOSE The purpose of this Health and Safety
Management Procedure (HSMP) is to ensure that processes
Key External Requirements Referenced include
|
There are periodic checks to confirm that sites have identified and mapped all relevant external expectations to company processes. Reviews also confirm that these company processes meet the requirements of these external expectation requirements and this is appropriately recorded. HSMP 3.4 – PR LEGAL AND OTHER REQUIREMENTS 6.6 Legal Compliance
Audit |
GMMHST2012-007 Provide contact information for Exploration and prepare an Exploration Operating Plan GMMHST2012-008 Prepare a Mining Operating Plan to receive an Operating Permit GMMHST2012-009 (1-3(d)) MOP to be submitted and detail names and mine setting GMMHST2012-009 (3(e-i)) MOP to include operating method, HSMS, and Water Management Details GMMHST2012-010 MOP can be modified with Chief Inspector approval GMMHST2012-023 Requirement to report on changes in ownership, leadership or mining activities to the Chief inspector GMMHST2012-024 Notify changes in statutory personnel and keep records on site of all appointed persons GMMHST2012-026 (1-4) Serious accidents, incidents and fatalities to be reported ASAP to the Chief Inspector other incidents to be reported to the nearest Inspector GMMHST2012-027 – Report any dangerous or serious incidents that could have caused serious injury or environmental harm GMMHST2012-034 Appointed Manager (or a formally nominated Acting Manager) to be available on site at all times GMMHST2012-040 Mine Managers are accountable for all regulated functions GMMHST2012-042 Lawful orders from Inspectors must be followed GMMHST2012-046 Mine Manager to not regularly work as a shift boss or mine foreman GMMHST2012-047 Divide the site into sections and appoint a shift boss or mine foreman to each section GMMHST2012-048 Manager or Mine Captain retains responsibilities even when acting in a subordinate role GMMHST2012-058 Accurate Survey plans of all workings, geology, buildings, and features to be prepared, controlled and submitted to the Chief Inspector GMMHST2012-066 Additional beacons and clearing of boundary lines at lease holders cost when requested GMMHST2012-069 Plans to be produced and submitted to the Chief Inspector (who can make copies) |
| BI-SPV.81.10 Clear accountabilities for designers, surveyors, engineers, and planners in site relevant management plans |
Site mine and road design guidelines and execution plans identify specific accountabilities for designers, engineers, and planners. |
Site mine and road
design guidelines and execution (e.g. traffic) management plans confirm site
performance requirements and include specific accountabilities for designers,
engineers, and planners. Designers, Surveyors, Engineers, and Planners manage and allocate resources to:
|
Designers, surveyors and engineers generate designs by applying site requirements and, as required, conducting risk assessments for new locations or requirements. Short term planners trained and assessed in mine design guidelines and develop plans according to the guidelines. Issued designs are formally reviewed and marked as approved to mine or construct. Traffic management is considered at each process step. OFI-141 Review, update, and apply the Tarkwa Traffic Management Plan GHG Tarkwa Traffic Management Plan, Mining Operations Procedure, TGM 1.10.54 WI was first approved for use on the 01-03-07. It is still current but has not been reviewed and updated since initial publication. It is a comprehensive document that confirms a range of site design and operating requirements that reflect good mine design and operating practice at Tarkwa. However, during the Tarkwa 2024 Vehicle Interaction Control Effectiveness (VICE) review, workshop participants identified misalignments between this key reference document and operational practice and conditions. These include:
These issues were confirmed by supporting consultants during mine tours and interviews. Consider a review of the Tarkwa Traffic Management plan in conjunction with the development of Gold Fields Minimum Standards for Vehicle interaction controls. At a minimum the review should revisit and update minimum requirements for:
OFI-163 Review Road Construction and Maintenance Standards Workshop participants report that haul road construction and maintenance is sometimes inadequate. Issues include steep ramps sometimes greater than 10%, rough ramps, substandard maintenance on haul roads. This situation increases equipment and tyre damage, slows production, and physically stresses operators. Confirm Tarkwa Mine road design standards and update processes to construct and maintain infrastructure to site standards. |
Regular planning meetings review traffic management. Design plans and related instructions are signed off by competent accountable personnel confirming that relevant road design and traffic management requirements are being met. Mine planners consider future vehicle interaction hazards and reliable controls. |
GMMHST2012-079 Avoid causing environmental damage when exploring GMMHST2012-075 Plans to conform with any Regulator Rules GMMHST2012-074 Plans to be fully detailed and accurate GMMHST2012-073 Surveyor Signed and Dated plans to be submitted GMMHST2012-082 Mine Design process to confirm stability (and monitoring), worker safety, blasting arrangements, and other factors GMMHST2012-083 Mine Designs and practices to include rigorous geotech analysis and identify considerations for nearby workings and final slope stability GMMHST2012-084 Road network to allow for safe vehicle operations addressing pavement quality and size, slope, curvature, cross grade, berms or windrows, and allow for emergencies (speed or fire) GMMHST2012-088 Design slopes with benches GMMHST2012-089 Maximum bench height to be within the reach of loading equipment GMMHST2012-288 Engineering Manager to implement a Management System to achieve fit for purpose equipment and appropriate defect management GMMHST2012-299 Equipment to allow for Tag Out Lock Out systems and have a Lock control system GMMHST2012-353 Engineering Manager to have systems to specify, implement, and maintain electrical equipment |
| BI-SPV.81.05 Clear accountabilities for managers, superintendents, and supervisors in site relevant road design guidelines and traffic management plans |
Site road design guidelines and traffic management plans identify specific accountabilities by organisation position. |
Site road design guidelines and traffic management plans confirm site performance requirements and assign accountability for their delivery to an organisation position. Competent senior managers, line managers, engineers and technical workers, and supervisors understand their responsibilities and accountabilities to:
GHG Tarkwa Traffic Management Plan, Mining Operations Procedure, TGM 1.10.54 WI as approved for use 01-03-07 Part 3 Responsibility This section confirms functions and tasks by responsible position for Managing Director, General Manager, Designated Managers and department Managers, Mining Manager, Protection Service Manager, Learning and Development Training Coordinator, Human Resources, direct and indirect employees, and visitors. Design and Construction Accountabilities Reference 6.1.2.6 All road designs by the planning team outside the mine site must be reviewed by the Chief Surveyor, Senior Mine Engineer, and Unit Manager Mining before the mine manager’s final approval. However, all in-pit roads (permanent and temporary) must be reviewed by the Chief Surveyor and Senior Mine Engineer before the mining manager’s final approval. After the road is constructed, it should be signed off. OFI-141 Review, update, and apply the Tarkwa Traffic Management Plan GHG Tarkwa Traffic Management Plan, Mining Operations Procedure, TGM 1.10.54 WI was first approved for use on the 01-03-07. It is still current but has not been reviewed and updated since initial publication. It is a comprehensive document that confirms a range of site design and operating requirements that reflect good mine design and operating practice at Tarkwa. However, during the Tarkwa 2024 Vehicle Interaction Control Effectiveness (VICE) review, workshop participants identified misalignments between this key reference document and operational practice and conditions. These include:
These issues were confirmed by supporting consultants during mine tours and interviews. Consider a review of the Tarkwa Traffic Management plan in conjunction with the development of Gold Fields Minimum Standards for Vehicle interaction controls. At a minimum the review should revisit and update minimum requirements for:
|
There are formal processes and design references that are applied by competent and experienced line managers to:
The design references set site performance standards and consider site, company, and regulatory design standards and requirements. OFI-163 Review Road Construction and Maintenance Standards Workshop participants report that haul road construction and maintenance is sometimes inadequate. Issues include steep ramps sometimes greater than 10%, rough ramps, substandard maintenance on haul roads. This situation increases equipment and tyre damage, slows production, and physically stresses operators. Confirm Tarkwa Mine road design standards and update processes to construct and maintain infrastructure to site standards. |
Traffic management plans are applied and maintained. Site inspection and reporting processes confirm that new and existing roads and supporting infrastructure meet site performance expectations, for example:
|
GMMHST2012-034 Appointed Manager (or a formally nominated Acting Manager) to be available on site at all times GMMHST2012-035 The Appointed Mine Manager has responsibility to enforce statutory requirements GMMHST2012-036 Underground Managers, Mine Captains (Superintendents) and Shotfirers to hold certificates in order to be appointed GMMHST2012-037 Open Pit Managers, Superintendents, and Mine Captains to be qualified and appointed GMMHST2012-038 Only qualified persons can be permitted to perform Quarry Manager roles |
| BI-SPV.82.01 Traffic Management Plan consultation and communication |
Operators and other involved personnel contribute to the safe and productive use of mobile equipment at site. |
The site has a formal consultation and communication approach that includes the development and maintenance of a traffic management plan. The process:
|
The traffic management plan is signed off. Operators, and other personnel who work around mobile equipment:
Supervisors routinely communicate and reinforce Traffic Management Plan requirements for:
|
The site Traffic Management Plan is current, signed by a senior manager, and has a process for formal consultation and communication with operators and other personnel who work around mobile equipment. Contribution measures such as:
Interviews with operators and other personnel who work around mobile equipment confirm knowledge about Site Traffic Management plan responsibilities and key processes. |
GMMHST2012-009 (3(e-i)) MOP to include operating method, HSMS, and Water Management Details GMMHST2012-084 Road network to allow for safe vehicle operations addressing pavement quality and size, slope, curvature, cross grade, berms or windrows, and allow for emergencies (speed or fire) GMMHST2012-097 Vehicles to be operated at safe speeds in a safe manner GMMHST2012-100 Develop and implement a Traffic Control Plan covering speeds, safe operating slopes, routes, TARPs, Vehicle heirarchy, and duties |
| BI-SPV.98.01 There is a documented site Traffic Management Plan |
There is a documented and current site Traffic Management Plan that assigns accountabilities and details the processes required for safe and operationally integrated outcomes when working with mobile equipment. |
There is a site process for developing, implementing, and maintaining a traffic management plan (TMP) or equivalent that:
GHG Tarkwa Traffic Management Plan, Mining Operations Procedure, TGM 1.10.54 WI as approved for use 01-03-07 Part 2 Scope The scope of this document encompasses all Tarkwa Mine surface operations including contractors and near mine exploration activities. This plan applies to all roads that are serviced and controlled by Gold Fields Tarkwa Mine including all haul roads to the mining areas and any other areas used by vehicles and equipment on site such as car parks, Tailings Dam access roads, ROM pads, Waste dump and workshop areas. This plan outlines and controls the operation of all vehicles and equipment operating on site and the required vehicle and equipment standards that must be met. All personnel, including contractors and visitors, shall comply with the requirements outlined in this document. |
The Traffic Management Plan details the site processes:
The TMP also confirms there is adequate capability and a plan for managing mobile equipment emergencies involving:
The TMP also documents how relevant external to site expectations are met for:
OFI-168: Confirm that experienced senior managers have oversight of site Traffic Management Plans Workshop participants discussed how experienced senior management from both Business Partners and Gold Fields have oversight and approve site traffic management plans and related processes. They also noted the extensive experience of senior managers from both Business Partners and Gold Fields. While processes are in place to delegate authority and review effectiveness, participants noted that pit conditions were not always to standard with variation in design and construction. Review and implement processes for maintaining, updating, and communication site traffic management plans. Confirm that site design and construction standards are applied and monitored. |
The TMP is reviewed, updated, and confirmed as being fit-for-purpose by senior management:
|
GMMHST2012-009 (3(e-i)) MOP to include operating method, HSMS, and Water Management Details GMMHST2012-058 Accurate Survey plans of all workings, geology, buildings, and features to be prepared, controlled and submitted to the Chief Inspector GMMHST2012-084 Road network to allow for safe vehicle operations addressing pavement quality and size, slope, curvature, cross grade, berms or windrows, and allow for emergencies (speed or fire) GMMHST2012-097 Vehicles to be operated at safe speeds in a safe manner |
| BI-SRA.82 Consultation and communication |
Multiple processes are in place to support effective health and safety communications between and across all organisational levels. |
Multiple processes are in place to support effective two-way health and safety communication between and across all organisational levels, including:
GFWA ESG Contractors and Suppliers June 2023 – Part 36 summarises requirements for safety representatives and safety committee. Part 37 sets requirements for holding safety meetings and requires a minimum attendance of one per month for contractors and subcontractors. HSMP 2.3 PR CONSULTATION, COMMUNICATION AND PARTICIPATION PURPOSE The purpose of this document is to ensure that;
|
Health and safety consultation and communication processes are in place that:
These consultation and communication processes:
|
Contractor minutes from safety committee meeting are copied to the Health and Safety Department. |
GMMHST2012-111 Stockpiles can not be filled and reclaimed at the same time and location. Chutes to be designed and maintained to allow free flow of material |
| BI-SRV.83.02 Senior management review, update, and confirm the Traffic Management Plan as being fit-for-purpose |
Senior managers periodically confirm that the site Traffic Management Plan (or equivalent) is fit-for-purpose. |
The Traffic Management Plan is reviewed, updated, and confirmed as being fit-for-purpose by senior management:
Occupational Health and Safety (OH&S) Management System Manual Ref No – HSMP 1.0 MN Implementation Date – 24/12/2004 5.1 LEADERSHIP AND COMMITMENT TGM Management shall demonstrate its commitment to Health and Safety leadership by: Leading by example;
|
Traffic Management Plan reviews are prepared by Technical and Operational superintendents and reviewed by relevant stakeholders representing Survey, Engineering, Maintenance, Development, Services, and other relevant sections. The review process also involves inputs from knowledgeable and experienced operators, supervisors and health and safety committee members. OFI-168: Confirm that experienced senior managers have oversight of site Traffic Management Plans Workshop participants discussed how experienced senior management from both Business Partners and Gold Fields have oversight and approve site traffic management plans and related processes. They also noted the extensive experience of senior managers from both Business Partners and Gold Fields. While processes are in place to delegate authority and review effectiveness, participants noted that pit conditions were not always to standard with variation in design and construction. Review and implement processes for maintaining, updating, and communication site traffic management plans. Confirm that site design and construction standards are applied and monitored. |
Routine operational reports confirm that the road network has been constructed and is being maintained to standard. By exception incident reporting. Formal reviews of the Traffic Management Plan to confirm if the site performance requirements are being met. Reviews also consider alignment between site performance requirements and
|
GMMHST2012-100 Develop and implement a Traffic Control Plan covering speeds, safe operating slopes, routes, TARPs, Vehicle heirarchy, and duties GMMHST2012-107 Dump and Stockpile Management Plans to be prepared covering construction, stability, environmental controls, and processes for certifying the pile as safe |